Revision history of "Installation of solar power plant installation on the premises of Górnośląskie Przedsiębiorstwa Wodociągów S.A. SUW Maczki in Sosnowiec based on photovoltaic panels as a source of power supply of water supply facilities of the Silesian Voivodship" (Q123670)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0320:03, 2 March 2023DG Regio talk contribs 61,213 bytes +178 Changed label, description and/or aliases in lv, it, sk, da, fi, sv, de, fr, bg, et, sl, el, pt, cs, ro, ga, hu, nl, hr, es, mt, lt, and other parts

25 October 2022

22 October 2022

2 July 2022

  • curprev 19:5319:53, 2 July 2022DG Regio talk contribs 59,377 bytes +36,202 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:5007:50, 2 December 2021DG Regio talk contribs 15,213 bytes +1,759 Created claim: summary (P836): Le projet consiste en l’achat d’infrastructures d’équipement destinées à l’utilisation de l’électricité à des fins propres. L’amélioration de l’efficacité énergétique sera un domaine d’action important. Le financement servira à la construction d’une centrale photovoltaïque située à la station de traitement de l’eau de Maczka à Sosnowiec. L’objectif du projet est de pouvoir produire de l’énergie à partir de sources renouvelables, de sorte que le...
  • curprev 07:5007:50, 2 December 2021DG Regio talk contribs 13,454 bytes +356 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 10:3610:36, 21 October 2020DG Regio talk contribs 13,537 bytes +312 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:3610:36, 21 October 2020DG Regio talk contribs 13,225 bytes −303 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:3610:36, 21 October 2020DG Regio talk contribs 13,528 bytes +1,608 Created claim: summary (P836): The project consists of the purchase of equipment infrastructure aimed at using electricity for their own needs. Improving energy efficiency will be an important range of activities. The funding will be used for the construction of a photovoltaic power plant located on the premises of the Maczki Water Treatment Station in Sosnowiec. The objective of the project is to be able to generate energy from renewable sources, so the project is directly p...
  • curprev 10:3610:36, 21 October 2020DG Regio talk contribs 11,920 bytes −1,133 Removed claim: summary (P836): The project consists of the purchase of equipment infrastructure focused on the use of electricity for own use. Improving energy efficiency will be an important activity. The financial contribution will be awarded for the construction of a photovoltaic power plant situated in the area of the Water Preservation Order in Sosnowiec. The aim of the project is to be able to produce energy from renewable sources and is therefore directly linked to t...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:0110:01, 10 March 2020DG Regio talk contribs 11,340 bytes +1,133 Created claim: summary (P836): The project consists of the purchase of equipment infrastructure focused on the use of electricity for own use. Improving energy efficiency will be an important activity. The financial contribution will be awarded for the construction of a photovoltaic power plant situated in the area of the Water Preservation Order in Sosnowiec. The aim of the project is to be able to produce energy from renewable sources and is therefore directly linked to the...

25 February 2020

18 February 2020

31 January 2020

14 January 2020