Revision history of "Improvement of the sludge economy in the Łęczyce Municipality (through the design and construction of a shelter for temporary deposit storage together with the modernisation of the sludge drainage line at the Bożepole Wielkie treatment plant)" (Q122588)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0120:01, 2 March 2023DG Regio talk contribs 59,945 bytes +507 Changed label, description and/or aliases in da, it, lv, ro, ga, sk, et, fi, bg, hr, de, sv, es, pt, el, sl, hu, cs, fr, lt, nl, mt, and other parts

26 October 2022

21 October 2022

27 July 2022

  • curprev 15:4115:41, 27 July 2022DG Regio talk contribs 57,324 bytes +35,548 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:3807:38, 2 December 2021DG Regio talk contribs 14,006 bytes +1,669 Created claim: summary (P836): Le projet sera situé dans le district de Wejherowski, dans la commune de Łęczyce, à Bożepole Wielkie. Dans cette région, une agglomération de déchets d’eau avec une station d’épuration à Bogampol Wielki a été désignée. Le projet comprend une solution globale au problème de la gestion des boues dans la station d’épuration. Dans le cadre du projet, deux tâches d’investissement sont prévues: 1. Construction d’abris pour le stockage temporaire des b...
  • curprev 07:3807:38, 2 December 2021DG Regio talk contribs 12,337 bytes +367 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 09:5409:54, 21 October 2020DG Regio talk contribs 12,409 bytes +305 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:5409:54, 21 October 2020DG Regio talk contribs 12,104 bytes −274 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:5409:54, 21 October 2020DG Regio talk contribs 12,378 bytes +1,581 Created claim: summary (P836): This project will be located in Wejherow County, in Łęczyce commune, in the area of Bożepole Wielkie. In this area was designated a water and sewage agglomeration with a treatment plant in Godpol Great. The project includes a comprehensive solution to the problem of sediment management in the treatment plant. As part of the project, two investment tasks are planned: 1. Construction of a shelter for temporary storage of sewage sludge prior to the...
  • curprev 09:5409:54, 21 October 2020DG Regio talk contribs 10,797 bytes −1,188 Removed claim: summary (P836): The project will be located in the municipality of Łęczyce in the municipality of Łęczyce in the municipality of Bożepol. In this area, the water and wastewater agglomeration was designated with the Water Treatment Plant in Bolzympol Wielkie. The project involves a comprehensive solution to the problem of the sludge management in the treatment plant. Two investment tasks are planned under the project: 1. Wind construction for the temporary sto...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 09:5709:57, 10 March 2020DG Regio talk contribs 10,704 bytes +1,188 Created claim: summary (P836): The project will be located in the municipality of Łęczyce in the municipality of Łęczyce in the municipality of Bożepol. In this area, the water and wastewater agglomeration was designated with the Water Treatment Plant in Bolzympol Wielkie. The project involves a comprehensive solution to the problem of the sludge management in the treatment plant. Two investment tasks are planned under the project: 1. Wind construction for the temporary stora...

24 February 2020

18 February 2020

31 January 2020

14 January 2020