Revision history of "Construction of sanitary sewage system in Smatowo Border – Centrum" (Q122582)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0120:01, 2 March 2023DG Regio talk contribs 62,406 bytes +1,255 Changed label, description and/or aliases in da, lv, it, sk, bg, cs, fr, hu, pt, mt, fi, ro, hr, ga, el, sv, et, de, es, lt, nl, sl, and other parts

26 October 2022

21 October 2022

27 July 2022

  • curprev 15:4115:41, 27 July 2022DG Regio talk contribs 59,037 bytes +36,647 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:3807:38, 2 December 2021DG Regio talk contribs 14,285 bytes +1,951 Created claim: summary (P836): L’objet du projet est la construction d’un système d’assainissement sanitaire avec raccordement dans la ville de Smytowo Graniczne — Centrum. Le projet prévoit d’effectuer des travaux de construction liés à la construction d’un système d’assainissement par gravité et de décharge ainsi qu’une usine de compression des eaux usées. La longueur totale du réseau d’assainissement sanitaire gravitationnel prévu avec les puits est de 2 293,5 m. L’objecti...
  • curprev 07:3807:38, 2 December 2021DG Regio talk contribs 12,334 bytes +149 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 12,624 bytes +127 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 12,497 bytes −134 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 12,631 bytes +1,852 Created claim: summary (P836): The subject of the project is the construction of sanitary sewage system with connections in the town of Smętowo Bordericzne – Centrum. As part of the project, construction works related to the construction of gravity and pressing sanitary sewers together with a sewage pressing plant are planned. The total length of the project’s gravitational sanitary sewage system and the well cinemas is 2293.5 m. The main aim of the project is to increase the...
  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 10,779 bytes −1,394 Removed claim: summary (P836): The object of the project is the construction of a sewerage system together with the connections in the Smentowo Border — Centre. The project plans to carry out construction works relating to the construction of a gravity and pressure sewage system, together with the pressure of waste water. The total length of the planned waste water collection network together with cathode ray tubes is 2 293.5 m. the main objective of the project is to incre...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 09:5709:57, 10 March 2020DG Regio talk contribs 10,895 bytes +1,394 Created claim: summary (P836): The object of the project is the construction of a sewerage system together with the connections in the Smentowo Border — Centre. The project plans to carry out construction works relating to the construction of a gravity and pressure sewage system, together with the pressure of waste water. The total length of the planned waste water collection network together with cathode ray tubes is 2 293.5 m. the main objective of the project is to increas...

24 February 2020

18 February 2020

31 January 2020

14 January 2020