Revision history of "Modernisation of sludge and waste management in municipal sewage treatment plants in Nowa Karczma commune" (Q122581)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1906:19, 9 October 2024DG Regio talk contribs 58,722 bytes +5 Changed label, description and/or aliases in pt
  • curprev 06:1906:19, 9 October 2024DG Regio talk contribs 58,717 bytes +30 Set a claim value: summary (P836): O projeto consiste na construção de um abrigo para o armazenamento de sedimentos, juntamente com as infraestruturas de acompanhamento necessárias, e na substituição do equipamento de pré-tratamento e de desidratação na estação de tratamento de águas residuais de Luban e Rekownicy, no município de Nowa Karczma. O projeto permitirá o desenvolvimento de sedimentos na quantidade de 450 Mg/ano. O projeto contribuirá para a execução do Eixo Prioritário 11...

20 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 16:5116:51, 2 March 2023DG Regio talk contribs 55,513 bytes −271 Changed label, description and/or aliases in lv, da, sk, lt, hu, ro, pt, sl, sv, fi, fr, et, bg, cs, el, ga, mt, nl, es, it, de, hr, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 19:2519:25, 2 July 2022DG Regio talk contribs 53,669 bytes +32,732 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:3807:38, 2 December 2021DG Regio talk contribs 13,593 bytes +1,713 Created claim: summary (P836): Le projet consiste à construire un abri de stockage des boues avec les infrastructures nécessaires et à remplacer les installations de prétraitement et d’assèchement des boues sur le site des stations d’épuration des eaux usées de Lubań et Rekownia à Nowa Karczma. Le projet permettra le développement de sédiments d’une quantité de 450 Mg/an. Le projet contribuera à la réalisation des résultats de la mise en œuvre de l’axe prioritaire 11 Environn...
  • curprev 07:3807:38, 2 December 2021DG Regio talk contribs 11,880 bytes +204 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 12,115 bytes +165 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 11,950 bytes −182 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 12,132 bytes +1,572 Created claim: summary (P836): The project consists of the construction of a shelter for sediment storage together with the necessary accompanying infrastructure and replacement of pre-treatment and dewatering equipment at the sewage treatment plant in Luban and Rekownicy in Nowa Karczma commune. The project will allow the development of sediments in the amount of 450 Mg/year. The project will contribute to achieving the implementation of Priority Axis 11 Environment ROP WP 2...
  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 10,560 bytes −1,123 Removed claim: summary (P836): The project consists of the construction of ponds for the storage of sludge, together with the necessary accompanying infrastructure and the replacement of pretreatment and drainage of sludge at the waste water treatment plant in Lubnia and Rekownica in the municipality of Nowa Karczma. The project will allow sludge to be managed in quantities of 450 tonnes/year. The project will contribute to the implementation of Priority Axis 11 of the 2014...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 09:5709:57, 10 March 2020DG Regio talk contribs 10,402 bytes +1,123 Created claim: summary (P836): The project consists of the construction of ponds for the storage of sludge, together with the necessary accompanying infrastructure and the replacement of pretreatment and drainage of sludge at the waste water treatment plant in Lubnia and Rekownica in the municipality of Nowa Karczma. The project will allow sludge to be managed in quantities of 450 tonnes/year. The project will contribute to the implementation of Priority Axis 11 of the 2014-2...

24 February 2020

18 February 2020

31 January 2020

14 January 2020