Revision history of "Extension of sewage treatment in Jabłów with the extension of the sewage system in Dąbrówka, Rokocin and Koteże." (Q122565)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:2505:25, 10 October 2024DG Regio talk contribs 69,733 bytes −17 Changed label, description and/or aliases in pt
  • curprev 05:2505:25, 10 October 2024DG Regio talk contribs 69,750 bytes +4 Set a claim value: summary (P836): Objeto do projeto: 1. Ampliação da estação de tratamento de águas residuais de Jabłów, aumentando a sua capacidade. O resultado aumentará a capacidade da estação de tratamento de 70080 para 190895 m3/ano (média diária de 192 para 523 m3/dia). 2. Construção de rede de esgotos sanitários por comprimento. 13,7 km equipado com 1644 RLM com acesso a esgoto sanitário e tratamento de águas residuais urbanas. O objetivo do projeto é o cumprimento, pela aglo...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0120:01, 2 March 2023DG Regio talk contribs 66,572 bytes +481 Changed label, description and/or aliases in it, da, sk, et, fi, ga, ro, es, lv, pt, hr, sv, hu, fr, lt, el, bg, nl, sl, mt, de, cs, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 19:2519:25, 2 July 2022DG Regio talk contribs 63,977 bytes +40,356 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:3707:37, 2 December 2021DG Regio talk contribs 14,737 bytes +2,094 Created claim: summary (P836): Objet du projet: 1. Extension de la station d’épuration des eaux usées de Jabłów, en augmentant sa capacité. En conséquence, la capacité de l’usine passera de 70080 à 190 895 m³/an (moyenne de 192 à 523 m³/jour). 2. Construction d’un réseau d’assainissement sanitaire 13,7 km d’équipement pour 1644 EH avec accès à des réseaux d’assainissement et de traitement des eaux urbaines résiduaires. L’objectif principal du projet est de respecter les engag...
  • curprev 07:3707:37, 2 December 2021DG Regio talk contribs 12,643 bytes +200 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 12,882 bytes +177 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 12,705 bytes −194 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 12,899 bytes +1,987 Created claim: summary (P836): Subject matter of the project: 1. Expansion of the sewage treatment plant in Jabłów, increasing its capacity. The result will increase throughputs. treatment plant from 70080 to 190895 m³/year, (average daily from 192 to 523 m³/day). 2. Construction of sanitary sewerage network by length. 13.7 km equipped with 1644 RLM with access to sanitary sewage and urban waste water treatment. The aim of the project is the fulfilment by the agglomeration of...
  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 10,912 bytes −1,421 Removed claim: summary (P836): Subject of the action: 1. Development of the wastewater treatment plant in Jabłowo, increasing its capacity. As a result, the plant will rise from 70080 to 190 895 m³/yr, (192 to 523 m³/day). 2. Construction of a health care network 13.7 km with 1644 p.e. in access to the urban wastewater and wastewater treatment network. The objective of the project is the completion of the accession commitments of the agglomeration and the objectives set. Th...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 09:5709:57, 10 March 2020DG Regio talk contribs 11,049 bytes +1,421 Created claim: summary (P836): Subject of the action: 1. Development of the wastewater treatment plant in Jabłowo, increasing its capacity. As a result, the plant will rise from 70080 to 190 895 m³/yr, (192 to 523 m³/day). 2. Construction of a health care network 13.7 km with 1644 p.e. in access to the urban wastewater and wastewater treatment network. The objective of the project is the completion of the accession commitments of the agglomeration and the objectives set. The...

24 February 2020

18 February 2020

31 January 2020

14 January 2020