Revision history of "“Construction of sewage system in Zamość Municipality Karsin”" (Q122562)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0120:01, 2 March 2023DG Regio talk contribs 44,771 bytes +365 Changed label, description and/or aliases in lv, it, sk, da, et, fi, bg, sl, hu, fr, ga, hr, cs, pt, ro, es, el, nl, sv, lt, de, mt, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 19:2419:24, 2 July 2022DG Regio talk contribs 42,293 bytes +24,660 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:3707:37, 2 December 2021DG Regio talk contribs 12,252 bytes +1,234 Created claim: summary (P836): Le projet consiste en la construction d’un réseau d’assainissement Zamość — Biała Błota (partie du village d’Osowo)-Osowo. Le réseau prévu couvrira 300 personnes. Un total d’environ 3,31 km de réseau d’assainissement gravitationnel, environ 2,52 km du réseau de drainage et 4 stations de pompage seront construits. Les eaux usées seront rejetées dans une station d’épuration de Cisewo., translated_summary
  • curprev 07:3707:37, 2 December 2021DG Regio talk contribs 11,018 bytes +161 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 11,296 bytes +126 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 11,170 bytes −138 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 11,308 bytes +1,176 Created claim: summary (P836): The project consists of building a sewerage network Zamość – Białe Błota (part of the village Osowo)- Osowo. The planned network will cover 300 people. In total, about 3.31 km of gravitational sewerage network, about 2.52 km of exhaust drainage network and 4 pumping stations will be built. The sewage will be taken to the treatment plant in Cisewo., translated_summary
  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 10,132 bytes −779 Removed claim: summary (P836): The project consists of the construction of a sewerage network of the Zamość — white blue box (part of the village of Osowo) — Osowo. Planned to build up the network will cover 300 people. In total, approximately 3.31 km of gravity sewer network will be constructed, about 2.52 km of the press sewer network and 4 network pumping stations. The waste water will be discharged to the plant in Cisevo., remove_old_english_translation

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 09:5709:57, 10 March 2020DG Regio talk contribs 9,617 bytes +779 Created claim: summary (P836): The project consists of the construction of a sewerage network of the Zamość — white blue box (part of the village of Osowo) — Osowo. Planned to build up the network will cover 300 people. In total, approximately 3.31 km of gravity sewer network will be constructed, about 2.52 km of the press sewer network and 4 network pumping stations. The waste water will be discharged to the plant in Cisevo., Adding English summary

25 February 2020

18 February 2020

31 January 2020

14 January 2020