Revision history of "“Expansion of composting plant in RIPOK Czarnówko”" (Q122545)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2218:22, 9 October 2024DG Regio talk contribs 68,249 bytes −1 Changed label, description and/or aliases in pt
  • curprev 18:2218:22, 9 October 2024DG Regio talk contribs 68,250 bytes +54 Set a claim value: summary (P836): O objetivo do investimento previsto é a ampliação da unidade de compostagem na Unidade Regional de Tratamento de Resíduos Municipais. Está prevista uma expansão faseada. Nesta fase, a construção de: —3 biorreatores e 1 sem armamento com sistema de purificação do ar de processo, ou seja, biofiltro e sistema de ventilação, ou seja, 3 ventiladores de arejamento construídos numa sala de ventilação de contentores; local de maturação do composto/estabiliz...

12 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0120:01, 2 March 2023DG Regio talk contribs 64,662 bytes −68 Changed label, description and/or aliases in da, it, sk, cs, lv, fi, et, pt, sv, hr, de, ga, el, bg, hu, ro, nl, fr, lt, mt, sl, and other parts

3 December 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 19:2419:24, 2 July 2022DG Regio talk contribs 59,798 bytes +37,530 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:3907:39, 2 December 2021DG Regio talk contribs 14,234 bytes +1,977 Created claim: summary (P836): L’objectif de l’investissement prévu est l’agrandissement de l’usine de compostage de l’usine régionale de traitement des déchets municipaux. Une extension progressive est supposée. À ce stade, la construction de: —3 bioréacteurs et 1 non armé avec installation pour la purification de l’air de procédé, c’est-à-dire biofiltre et système de ventilation i.e. 3 ventilateurs d’aération installés dans une salle d’aération; carré de maturation/stabilis...
  • curprev 07:3907:39, 2 December 2021DG Regio talk contribs 12,257 bytes +119 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 09:5209:52, 21 October 2020DG Regio talk contribs 12,577 bytes +114 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:5209:52, 21 October 2020DG Regio talk contribs 12,463 bytes −118 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:5209:52, 21 October 2020DG Regio talk contribs 12,581 bytes +1,788 Created claim: summary (P836): The object of the planned investment is the expansion of the composting plant in the Regional Municipal Waste Processing Plant. A phased expansion is planned. At this stage, the construction of: —3 bioreactors and 1 without armament with process air purification system i.e. biofilter and ventilation system i.e. 3 aeration fans built in a container fan room; compost/stabilisation maturation site; a paved area between the bioreactors and the matur...
  • curprev 09:5209:52, 21 October 2020DG Regio talk contribs 10,793 bytes −1,359 Removed claim: summary (P836): The purpose of the planned investment is to expand the composting plant in the area of municipal waste processing. The extension of the phase is assumed. At this stage, it is envisaged to build: — 3 bioreactors and 1 empty reactors with process air cleaning systems, i.e. a biofilter and a ventilation system, i.e. 3 ventilation fans built in a container fan in a container; compost/stabilisation square; surfaced area between bioreactors and a ri...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 09:5209:52, 10 March 2020DG Regio talk contribs 10,862 bytes +1,359 Created claim: summary (P836): The purpose of the planned investment is to expand the composting plant in the area of municipal waste processing. The extension of the phase is assumed. At this stage, it is envisaged to build: — 3 bioreactors and 1 empty reactors with process air cleaning systems, i.e. a biofilter and a ventilation system, i.e. 3 ventilation fans built in a container fan in a container; compost/stabilisation square; surfaced area between bioreactors and a ripe...

25 February 2020

18 February 2020

31 January 2020

14 January 2020