Revision history of "Construction of a selective collection system for municipal waste in the municipality of Kartuzy" (Q122540)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:2716:27, 10 October 2024DG Regio talk contribs 63,120 bytes 0 Changed label, description and/or aliases in pt
  • curprev 16:2716:27, 10 October 2024DG Regio talk contribs 63,120 bytes +11 Set a claim value: summary (P836): O principal objetivo do projeto é aumentar a eficiência do sistema de gestão municipal em funcionamento no município de Kartuza. O projeto previsto está relacionado com o desenvolvimento da infraestrutura de recolha seletiva de resíduos urbanos, nomeadamente a construção de um ponto de recolha seletiva de resíduos urbanos na cidade de Kartuza, que será adicionalmente equipado com: — ponto de reparação, — ponto de reutilização, — ponto de recolha de...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

2 July 2022

  • curprev 19:2419:24, 2 July 2022DG Regio talk contribs 59,465 bytes +36,951 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 May 2022

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:3807:38, 2 December 2021DG Regio talk contribs 14,304 bytes +1,950 Created claim: summary (P836): L’objectif principal du projet est d’accroître l’efficacité du système de gestion des déchets municipaux en fonctionnement dans la municipalité de Kartuza. Le projet envisagé est lié au développement d’infrastructures de collecte séparée des déchets municipaux, à savoir la construction d’un point de collecte séparée des déchets municipaux dans la ville de Kartuzy, qui sera également équipé: — point de réparation, — point de réutilisation, — poin...
  • curprev 07:3807:38, 2 December 2021DG Regio talk contribs 12,354 bytes +167 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 09:5209:52, 21 October 2020DG Regio talk contribs 12,626 bytes +155 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:5209:52, 21 October 2020DG Regio talk contribs 12,471 bytes −152 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:5209:52, 21 October 2020DG Regio talk contribs 12,623 bytes +1,825 Created claim: summary (P836): The main objective of the project is to increase the efficiency of the functioning municipal management system in the municipality of Kartuza.The planned project is related to the development of the infrastructure for selective collection of municipal waste, namely the construction of a selective collection point for municipal waste in the city of Kartuza, which will additionally be equipped with: — repair point, – point of reuse, – point of col...
  • curprev 09:5209:52, 21 October 2020DG Regio talk contribs 10,798 bytes −1,354 Removed claim: summary (P836): The main purpose of the project is to increase the efficiency of the urban sprawl regime in the municipality of Kartabuje. the planned project is linked to the development of the infrastructure for the separate collection of municipal waste, and the construction of a separate collection point for municipal waste in the Karteusis, which will also be equipped with: — the repair point, the re-use point, the collection point for waste electrical a...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 09:5209:52, 10 March 2020DG Regio talk contribs 10,867 bytes +1,354 Created claim: summary (P836): The main purpose of the project is to increase the efficiency of the urban sprawl regime in the municipality of Kartabuje. the planned project is linked to the development of the infrastructure for the separate collection of municipal waste, and the construction of a separate collection point for municipal waste in the Karteusis, which will also be equipped with: — the repair point, the re-use point, the collection point for waste electrical and...

25 February 2020

18 February 2020

31 January 2020

14 January 2020