Revision history of "Construction of the Municipal Waste Collection Point in Kaliska" (Q122528)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:2716:27, 10 October 2024DG Regio talk contribs 65,867 bytes −12 Changed label, description and/or aliases in pt
  • curprev 16:2716:27, 10 October 2024DG Regio talk contribs 65,879 bytes +20 Set a claim value: summary (P836): A implementação do PSZOK inclui: 1.dokum. projecto. com arranjos. 2. construção do PSZOK – área pavimentada até 1.100 m2 vedada com folha PEHD – saída da estrada local, – contentor social e de escritório com equipamento até 20 m2, – contentor até 72 m2 – sala de ensino, parte social e WC – percurso educativo até 100 m2; —armazém de armazenamento com uma área até 384 m2, — um piso com uma parede de resistência até 100 m2. Infraestrutura: —instalações...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0120:01, 2 March 2023DG Regio talk contribs 62,686 bytes −580 Changed label, description and/or aliases in it, da, sk, lv, fi, de, ro, cs, sl, lt, pt, hr, es, nl, bg, fr, ga, et, hu, mt, sv, el, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 19:2319:23, 2 July 2022DG Regio talk contribs 61,152 bytes +38,647 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:3807:38, 2 December 2021DG Regio talk contribs 14,307 bytes +1,973 Created claim: summary (P836): La mise en œuvre du PSZOK comprend: 1.doc. projet. avec arrangements. 2.construction de PSZOK — plate-forme durcie d’une superficie allant jusqu’à 1,100 m² scellée avec film PEHD — sortie de la route locale, — conteneur social avec équipement jusqu’à 20 m², — conteneur jusqu’à 72 m² — salle éducative, partie sociale et toilette — chemin éducatif jusqu’à 100 m²; entrepôt d’une superficie allant jusqu’à 384 m², — une plate-forme avec un mur de sou...
  • curprev 07:3807:38, 2 December 2021DG Regio talk contribs 12,334 bytes +127 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 09:4109:41, 21 October 2020DG Regio talk contribs 12,646 bytes +122 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:4109:41, 21 October 2020DG Regio talk contribs 12,524 bytes −142 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:4109:41, 21 October 2020DG Regio talk contribs 12,666 bytes +1,892 Created claim: summary (P836): The implementation of PSZOK includes: 1.dokum. project. with arrangements. 2. construction of PSZOK – paved area of up to 1.100 m² sealed with PEHD foil – exit from the local road, – social and office container with equipment up to 20 m², –container up to 72 m² – educational room, social part and toilet – educational path up to 100 m²; —storage warehouse with an area of up to 384 m², – a floor with a resistance wall up to 100 m². Infrastructure:...
  • curprev 09:4109:41, 21 October 2020DG Regio talk contribs 10,774 bytes −1,312 Removed claim: summary (P836): The implementation of the “PSZOK” includes: 1.Notes. 2.Construction of PSZOK — paved, with a space of up to 1.100 m² sealed with PEHD, to depart from the local road, — a community and office container up to 20 m², — container up to 72 m² — Educational strain, part of a social part and of WC, an educational pathway of up to 100 m²; Storage hall for up to 384 m², — beach with a wall wall of up to 100 m². Infrastructure: Installations: water supp...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 09:5209:52, 10 March 2020DG Regio talk contribs 10,796 bytes +1,312 Created claim: summary (P836): The implementation of the “PSZOK” includes: 1.Notes. 2.Construction of PSZOK — paved, with a space of up to 1.100 m² sealed with PEHD, to depart from the local road, — a community and office container up to 20 m², — container up to 72 m² — Educational strain, part of a social part and of WC, an educational pathway of up to 100 m²; Storage hall for up to 384 m², — beach with a wall wall of up to 100 m². Infrastructure: Installations: water supply...

25 February 2020

18 February 2020

31 January 2020

14 January 2020