Revision history of "Investment of renewable energy sources in the towns of Borzytuchom, Czarna Dąbrówka and Tuchomie" (Q122462)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

27 July 2022

  • curprev 15:3915:39, 27 July 2022DG Regio talk contribs 56,488 bytes +34,964 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:3807:38, 2 December 2021DG Regio talk contribs 13,899 bytes +1,771 Created claim: summary (P836): Le projet comprend la construction de 97 installations de panneaux photovoltaïques, 253 capteurs solaires, 47 installations de pompes à chaleur, 67 installations de chaudières à biomasse. Le projet couvrira 32 bâtiments publics et 432 bâtiments résidentiels de Borzytuchom, Tuchomie et Czarna Dąbrówka. Le projet réduira 1 718,45 Mg de CO2/an. La capacité totale des installations SER construites sera de 3,65 MW. L’objectif principal du projet est...
  • curprev 07:3807:38, 2 December 2021DG Regio talk contribs 12,128 bytes +182 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 09:4009:40, 21 October 2020DG Regio talk contribs 12,385 bytes +157 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:4009:40, 21 October 2020DG Regio talk contribs 12,228 bytes −162 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:4009:40, 21 October 2020DG Regio talk contribs 12,390 bytes +1,691 Created claim: summary (P836): The project consists of the construction of 97 installations of photovoltaic panels, 253 solar collectors installations, 47 heat pump systems, 67 biomass boiler systems. The project will cover 32 public buildings and 432 residential buildings from Borzytuchom, Tuchomie and Czarna Dąbrówka. The project will reduce 1 718.45 Mg CO2/year. The total capacity of the built RES installations will be 3,65 MW. The main objective of the project is to incre...
  • curprev 09:4009:40, 21 October 2020DG Regio talk contribs 10,699 bytes −1,235 Removed claim: summary (P836): The project consists of the construction of 97 photovoltaic installations, 253 solar collectors installations, 47 heat pump installations, 67 biomass boiler installations. The project will include 32 public buildings and 432 residential buildings from the municipality of Borzytukhom, Tuchop and Czarna Dąbrówka. The project will allow a reduction of 1 718,45 Mg CO2/rok. The total capacity of the RES installations built will be 3.65 MW. The main...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 09:5209:52, 10 March 2020DG Regio talk contribs 10,650 bytes +1,235 Created claim: summary (P836): The project consists of the construction of 97 photovoltaic installations, 253 solar collectors installations, 47 heat pump installations, 67 biomass boiler installations. The project will include 32 public buildings and 432 residential buildings from the municipality of Borzytukhom, Tuchop and Czarna Dąbrówka. The project will allow a reduction of 1 718,45 Mg CO2/rok. The total capacity of the RES installations built will be 3.65 MW. The main a...

25 February 2020

18 February 2020

31 January 2020

14 January 2020