Revision history of "Renewable energy sources in the Municipality of Mikołajki Pomorskie and in the City and Municipality of Sztum" (Q122443)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:4015:40, 7 October 2024DG Regio talk contribs 60,739 bytes +10 Changed label, description and/or aliases in pt
  • curprev 15:4015:40, 7 October 2024DG Regio talk contribs 60,729 bytes −1 Set a claim value: summary (P836): O projeto envolve a aquisição e instalação de instalações de energias renováveis nos municípios de Mikołajka Pomorskie e G.i M. Sztum. O projeto resultará numa redução da procura de combustíveis fósseis tradicionais. No total, serão criadas 208 instalações, incluindo: Líder do projeto – Mikołajki Pomorskie: —colecto solar. 200 l-20 colectes solares 300 l-10 pcs -collect. solar 400 l-1 pcs -potência da bomba de calor 3,5 kW-20 peças - caldeiras para...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 15:3915:39, 27 July 2022DG Regio talk contribs 57,770 bytes +35,876 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:3707:37, 2 December 2021DG Regio talk contribs 14,085 bytes +1,869 Created claim: summary (P836): Le projet comprend l’achat et l’installation d’installations d’énergie renouvelable dans les municipalités de Mikołajki Pomorskie et G.i M. Sztum. Le projet permettra de réduire les besoins en combustibles fossiles traditionnels. Au total, 208 installations seront créées, dont: Responsable du projet-Gm.Mikołajki Pomorskie: —solaire 200 l-20 pcs -solar 300 l-10 pcs.solar 400 l-1 pcs — pompes à chaleur puissance 3,5 kW-20 pcs — chaudières à biomas...
  • curprev 07:3707:37, 2 December 2021DG Regio talk contribs 12,216 bytes +186 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 09:3909:39, 21 October 2020DG Regio talk contribs 12,469 bytes +170 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:3909:39, 21 October 2020DG Regio talk contribs 12,299 bytes −160 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:3909:39, 21 October 2020DG Regio talk contribs 12,459 bytes +1,737 Created claim: summary (P836): The project involves the purchase and installation of renewable energy installations in the Municipalities of Mikołajka Pomorskie and G.i M. Sztum. The project will result in a reduction in demand for traditional fossil fuels.In total, 208 installations will be created, including: Project leader-Gm.Mikołajki Pomorskie: —solar colect. 200 l-20 solar colects 300 l-10 pcs -collect. solar 400 l-1 pcs -heat pump power 3,5 kW-20 pieces – boilers for b...
  • curprev 09:3909:39, 21 October 2020DG Regio talk contribs 10,722 bytes −1,324 Removed claim: summary (P836): The project involves the purchase and installation of renewable energy installations in the municipalities of Mikołajki Pomorskie and G.and M. Sztum. The project will have the effect of reducing the requirement for traditional mining fuels. in total, 208 installations will be created, including: ProjectGm.Mikołajki Pomorski: 200 ll-20 noise of 300 l-10 noise heat pumps — 400 l-1 heat pumps — power pumps 3.5 kW-20 heat pumps power plants for bi...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 09:4809:48, 10 March 2020DG Regio talk contribs 10,756 bytes +1,324 Created claim: summary (P836): The project involves the purchase and installation of renewable energy installations in the municipalities of Mikołajki Pomorskie and G.and M. Sztum. The project will have the effect of reducing the requirement for traditional mining fuels. in total, 208 installations will be created, including: ProjectGm.Mikołajki Pomorski: 200 ll-20 noise of 300 l-10 noise heat pumps — 400 l-1 heat pumps — power pumps 3.5 kW-20 heat pumps power plants for biom...

25 February 2020

18 February 2020

31 January 2020

14 January 2020