Revision history of "Preparation of preparatory documentation for the project “Improving capacity on line No. 213 Reda – Hel”" (Q122353)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0020:00, 2 March 2023DG Regio talk contribs 53,806 bytes +449 Changed label, description and/or aliases in lv, da, sk, it, de, fr, fi, hr, et, ro, sv, es, ga, pt, hu, sl, el, bg, lt, cs, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

27 September 2022

2 July 2022

  • curprev 19:1919:19, 2 July 2022DG Regio talk contribs 50,043 bytes +30,272 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:2308:23, 2 December 2021DG Regio talk contribs 13,116 bytes +1,512 Created claim: summary (P836): Préparation de la documentation préparatoire du projet «Amélioration de la capacité sur la ligne no 213 Reda — Hel», dans lequel un inventaire détaillé de la ligne sera réalisé, suivi d’une étude de faisabilité conforme aux normes applicables (en tenant compte de la portée et des coûts des travaux), de la fiche d’information du projet, s’il y a une décision sur la nécessité de réaliser une évaluation des incidences sur l’environnement, également...
  • curprev 08:2308:23, 2 December 2021DG Regio talk contribs 11,604 bytes +185 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 09:3409:34, 21 October 2020DG Regio talk contribs 11,858 bytes +170 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:3409:34, 21 October 2020DG Regio talk contribs 11,688 bytes −166 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:3409:34, 21 October 2020DG Regio talk contribs 11,854 bytes +1,384 Created claim: summary (P836): Preparation of preparatory documentation for the project “Improving capacity on line No.213 Reda – Hel”, where detailed inventory of the line will be carried out, followed by a feasibility study in accordance with the applicable standards (including scope and costs of works), information sheet of the project, if there is a need for environmental impact assessment, also an EIA report in order to take financial and material decisions regarding pla...
  • curprev 09:3409:34, 21 October 2020DG Regio talk contribs 10,470 bytes −964 Removed claim: summary (P836): The preparation of the preparatory documentation for the project ‘Improvement of capacity on line No 213 Reda — Hel’, under which a detailed inventory of the line will be carried out, followed by a feasibility study in line with the standards in force (including the scope and cost of the works), the project information sheet, if it is to make a provision on the need to carry out an environmental impact assessment, also an EIA report to make fi...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 09:4709:47, 10 March 2020DG Regio talk contribs 10,151 bytes +964 Created claim: summary (P836): The preparation of the preparatory documentation for the project ‘Improvement of capacity on line No 213 Reda — Hel’, under which a detailed inventory of the line will be carried out, followed by a feasibility study in line with the standards in force (including the scope and cost of the works), the project information sheet, if it is to make a provision on the need to carry out an environmental impact assessment, also an EIA report to make fina...

25 February 2020

18 February 2020

31 January 2020

14 January 2020