Revision history of "Revitalisation of the Old Town and Railway Station in Skarszewy" (Q122255)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:3418:34, 8 October 2024DG Regio talk contribs 63,559 bytes +3 Changed label, description and/or aliases in pt
  • curprev 18:3418:34, 8 October 2024DG Regio talk contribs 63,556 bytes −76 Set a claim value: summary (P836): O projeto prevê: 1.Adaptação do edifício na 9 Dworcowa Street para o Centro de Apoio à Família a partir dos arredores 2.Renovação de elementos de construção comuns e desenvolvimento do ambiente(13 comunidades, inclui 1 edifício municipal) 3.Criação de um local de entretenimento e recreação na 4 Grobla Mickiewicza Street.Adaptação de muros defensivos medievais para fins educativos e recreativos. 5.Reconstrução e reconstrução de infraestruturas rodovi...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 19:1719:17, 2 July 2022DG Regio talk contribs 57,769 bytes +35,717 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:1608:16, 2 December 2021DG Regio talk contribs 14,088 bytes +1,908 Created claim: summary (P836): Dans le cadre du projet: 1.Adaptation du bâtiment au 9 rue Dworcowa au centre de soutien familial avec superficie. 2.Rénovation des éléments communs des bâtiments et développement des environs (13 communautés, dont 1 bâtiment commun) 3.Création d’un lieu de jeux et de loisirs à ul.Grobla Mickiewicza 4.Adaptation de murs défensifs médiévaux à des fins éducatives et cultes. 5.Établissement de la rive de la rivière Wietcisa avec rénovation d’ul.Wod...
  • curprev 08:1608:16, 2 December 2021DG Regio talk contribs 12,180 bytes +120 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 09:1609:16, 21 October 2020DG Regio talk contribs 12,499 bytes +122 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:1609:16, 21 October 2020DG Regio talk contribs 12,377 bytes −119 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:1609:16, 21 October 2020DG Regio talk contribs 12,496 bytes +1,777 Created claim: summary (P836): The project plans to: 1.Adaptation of the building at 9 Dworcowa Street to the Family Support Centre from the surroundings 2.Renovation of common building elements and development of the environment(13 communities, includes 1 municipal building) 3.Creation of a place of entertainment and recreation at 4 Grobla Mickiewicza Street.Adaptation of medieval defensive walls for educational and recreation purposes. 5.Reconstruction and reconstruction of...
  • curprev 09:1609:16, 21 October 2020DG Regio talk contribs 10,719 bytes −1,471 Removed claim: summary (P836): The project is designed to: 1.Adaptations to the building at ul.Dworwa 9 to the Centre for Family Support and ambient 2.The renewal of the common building elements and the installation of an environment without surroundings (13 communities, covers 1 communal buildings) 3.play of play of recreation and recreation at the ul.Grobla Mickiewicza. 4.Adaptations to the media-related mediaeval walls for education and culture. 5.Managing the bank of th...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 09:5209:52, 10 March 2020DG Regio talk contribs 10,901 bytes +1,471 Created claim: summary (P836): The project is designed to: 1.Adaptations to the building at ul.Dworwa 9 to the Centre for Family Support and ambient 2.The renewal of the common building elements and the installation of an environment without surroundings (13 communities, covers 1 communal buildings) 3.play of play of recreation and recreation at the ul.Grobla Mickiewicza. 4.Adaptations to the media-related mediaeval walls for education and culture. 5.Managing the bank of the...

25 February 2020

18 February 2020

31 January 2020

14 January 2020