Revision history of "Revitalisation of downtown Wejherov" (Q122235)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:4015:40, 7 October 2024DG Regio talk contribs 64,056 bytes −1 Changed label, description and/or aliases in pt
  • curprev 15:4015:40, 7 October 2024DG Regio talk contribs 64,057 bytes +12 Set a claim value: summary (P836): O projeto prevê as seguintes tarefas: 1)Clube de Integração Social – adaptação das instalações da ul. Copernicus 22, 2)Utilização de zonas urbanas: Parque no rio Cedron e Parque Kaszubski, 3) construção de uma ligação rodoviária que liga ul. Um parque da ul. Mickiewicza em Wejherowo (ul. É São João. Anna), 4) pátios verdes (28 WM e 1 MS), 5)Duas filas a pé: na rua. Sobieski e ao longo do rio Cedron, construção-conjunto de parceiros, instrumento de f...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:3121:31, 2 March 2023DG Regio talk contribs 62,372 bytes +38 Changed label, description and/or aliases in sk, it, da, el, sv, ro, hu, fi, lv, fr, cs, ga, et, pt, lt, mt, es, nl, hr, de, sl, bg, and other parts

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 19:1719:17, 2 July 2022DG Regio talk contribs 60,221 bytes +37,694 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:1508:15, 2 December 2021DG Regio talk contribs 14,292 bytes +2,003 Created claim: summary (P836): Le projet prévoit les tâches suivantes: 1)Club de l’intégration sociale — adaptation des locaux à l’ul. Copernicus 22, 2)développement de l’espace urbain: Parc sur la rivière Cedron et Kashubian Park, 3) construction d’un lien routier reliant ul. Un parc d’ul. Mickiewicza à Wejherowo (ul. Jour de la Saint-Jean Anna), 4) cour verte (28 WM et 1 SM), 5)deux pistes de vélo à pied: dans la rue. Sobieski et le long de la rivière Cedron, travaux de con...
  • curprev 08:1508:15, 2 December 2021DG Regio talk contribs 12,289 bytes +102 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 09:1609:16, 21 October 2020DG Regio talk contribs 12,626 bytes +94 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:1609:16, 21 October 2020DG Regio talk contribs 12,532 bytes −80 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:1509:15, 21 October 2020DG Regio talk contribs 12,612 bytes +1,911 Created claim: summary (P836): The project envisages the following tasks: 1)Club Social Integration – adaptation of the premises at ul. Copernicus 22, 2)Using of urban areas: Park on the river Cedron and Park Kaszubski, 3) construction of a road link connecting ul. A park from ul. Mickiewicza in Wejherowo (ul. It’s St. John. Anna), 4) green yards (28 WM and 1 MS), 5)Two rows on foot: on the street. Sobieski and along the river Cedron, construction-assembly of partners, flexib...
  • curprev 09:1509:15, 21 October 2020DG Regio talk contribs 10,701 bytes −1,407 Removed claim: summary (P836): The project foresees the following tasks: 1) Social Integration — adaptation of the premises at ul. Korpernika 22, 2) Urban development: Park on the River Cedron River and the Kaszubski Park, 3) the construction of a road link linking the ul. Parkova, ul. Mickiewicza, in Wejherowie (ul. ST Anna), 4) farmyards (28 WM and 1 SM), 5) two pedestrians and cyclists: at ul. Sobieski and along the River Cedron, the construction of partners, the Flexibi...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 10:2010:20, 10 March 2020DG Regio talk contribs 10,823 bytes +1,407 Created claim: summary (P836): The project foresees the following tasks: 1) Social Integration — adaptation of the premises at ul. Korpernika 22, 2) Urban development: Park on the River Cedron River and the Kaszubski Park, 3) the construction of a road link linking the ul. Parkova, ul. Mickiewicza, in Wejherowie (ul. ST Anna), 4) farmyards (28 WM and 1 SM), 5) two pedestrians and cyclists: at ul. Sobieski and along the River Cedron, the construction of partners, the Flexibili...

25 February 2020

18 February 2020

31 January 2020

14 January 2020