Revision history of "Creation of new kindergarten places in public kindergarten in Lubzin" (Q120223)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2118:21, 9 October 2024DG Regio talk contribs 84,464 bytes −11 Changed label, description and/or aliases in pt
  • curprev 18:2118:21, 9 October 2024DG Regio talk contribs 84,475 bytes −140 Set a claim value: summary (P836): Aumentar o acesso à educação pré-escolar na comuna de Ropczyce através da criação de 20 vagas adicionais na pré-escola pública de Lubzin para crianças com idades compreendidas entre os 3 e os 5 anos (11dz/9ch) e da igualdade de oportunidades educativas através do acesso a aulas de terapia da fala para 24 crianças (11 dz) e aulas de música e arte para 54 crianças (28 Dz) no período de 1.09.2018 a 31.08.2019 O projeto inclui a criação de 2 tipos de pr...

7 March 2024

15 January 2024

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5619:56, 2 March 2023DG Regio talk contribs 82,218 bytes +2,371 Changed label, description and/or aliases in it, da, sk, fi, hr, fr, lv, ga, sv, el, lt, ro, bg, et, hu, pt, sl, cs, es, nl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 18:3318:33, 2 July 2022DG Regio talk contribs 77,711 bytes +49,398 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 06:4306:43, 2 December 2021DG Regio talk contribs 16,891 bytes +2,950 Created claim: summary (P836): Accroître l’accès à l’éducation préscolaire dans la commune de Ropczyce en générant 20 places préscolaires supplémentaires à Lubzin maternelle publique pour les enfants âgés de 3 à 5 ans (11 dz/9ch) et l’égalité des chances en matière d’éducation par l’accès à des thérapies vocales pour 24 enfants (11 dz) et à des cours de musique et d’art pour 54 enfants (28 Dz) entre le 1er septembre 2018 et le 31 août 2019. Le projet comprend la mise en œuvre...
  • curprev 06:4306:43, 2 December 2021DG Regio talk contribs 13,941 bytes +146 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:3416:34, 20 October 2020DG Regio talk contribs 14,234 bytes +127 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3416:34, 20 October 2020DG Regio talk contribs 14,107 bytes −143 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3416:34, 20 October 2020DG Regio talk contribs 14,250 bytes +2,522 Created claim: summary (P836): Increase access to pre-school education in the commune of Ropczyce by generating 20 additional preschool places in the Public Preschool in Lubzin for children aged 3-5 years (11dz/9ch) and equal educational opportunities by providing access to speech therapy classes for 24 children (11 dz) and music and art classes for 54 children (28 Dz) in the period from 1.09.2018 to 31.08.2019 The project includes the creation of 2 types of projects planned...
  • curprev 16:3416:34, 20 October 2020DG Regio talk contribs 11,728 bytes −2,287 Removed claim: summary (P836): Increasing the access to pre-school education in the municipality of Ropczyce through the generation of 20 additional pre-school facilities in the Public Service of Lubzenzie for children aged 3-5 (11dz/9ch) and the levelling of educational opportunities by providing access to the speech therapy for 24 children (11 dz) and musical and artistic classes for 54 children (28 Dz) in the period from 1.09.2018 to 31.08.2019. the project covers the 2...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 09:4909:49, 10 March 2020DG Regio talk contribs 12,727 bytes +2,287 Created claim: summary (P836): Increasing the access to pre-school education in the municipality of Ropczyce through the generation of 20 additional pre-school facilities in the Public Service of Lubzenzie for children aged 3-5 (11dz/9ch) and the levelling of educational opportunities by providing access to the speech therapy for 24 children (11 dz) and musical and artistic classes for 54 children (28 Dz) in the period from 1.09.2018 to 31.08.2019. the project covers the 2 ty...

25 February 2020

18 February 2020

31 January 2020

14 January 2020