Revision history of "Certification of hot water boilers ROJEK PK 20 – ROJEK PK 60" (Q11961)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 50,125 bytes +1 Changed label, description and/or aliases in pt
  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 50,124 bytes +27 Set a claim value: summary (P836): Medição e avaliação dos parâmetros técnicos críticos das instalações térmicas e ecológicas, incluindo a sua segurança durante o funcionamento. O relatório de ensaio contendo o sujeito do ensaio, o certificado de ensaio e o certificado (conformidade com o Regulamento Governamental n.o 163/2002 Coll.) será o resultado dos ensaios. ), para os seguintes produtos: 1. Caldeiras aquecem com combustível sólido com fornecimento manual de combustível ROJEK PK...

7 March 2024

15 January 2024

11 June 2023

20 February 2023

17 February 2023

2 July 2022

  • curprev 18:1418:14, 2 July 2022DG Regio talk contribs 48,430 bytes +28,590 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

12 December 2021

2 December 2021

  • curprev 07:5607:56, 2 December 2021DG Regio talk contribs 15,128 bytes +1,455 Created claim: summary (P836): Messung und Bewertung kritischer technischer Parameter von thermischen und ökologischen Geräten, einschließlich ihrer Sicherheit während des Betriebs. Bei den Prüfergebnissen des Labors handelt es sich um einen Prüfbericht mit dem Gegenstand der Prüfungen, eine Prüfbescheinigung, eine Bescheinigung (Konformität mit der Regierungsverordnung Nr. 163/2002 Slg. ), für folgende Produkte: 1.Fixed Heizkessel mit manueller Kraftstoffabgabe ROJEK PK 20,...
  • curprev 07:5607:56, 2 December 2021DG Regio talk contribs 13,673 bytes +123 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 09:2309:23, 28 November 2021DG Regio talk contribs 13,550 bytes +1,475 Created claim: summary (P836): Mesure et évaluation des paramètres techniques critiques des équipements thermiques et écologiques, y compris leur sécurité pendant le fonctionnement. Les résultats des essais du laboratoire seront un procès-verbal d’essai contenant l’objet des essais, un certificat d’essai, un certificat (conformité avec le règlement gouvernemental no 163/2002 Coll. ), pour les produits suivants: Chaudières à combustible 1.Fixed avec livraison manuelle de combu...
  • curprev 09:2309:23, 28 November 2021DG Regio talk contribs 12,075 bytes +130 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 15:1415:14, 22 October 2020DG Regio talk contribs 12,394 bytes +1,376 Created claim: summary (P836): Measurement and assessment of critical technical parameters of thermal and ecological installations, including their safety during operation. The test report containing the test subject, test certificate, certificate (conformity with Government Regulation No. 163/2002 Coll.) will be the result of the tests. ), for the following products: 1.Boilers heat on solid fuel with manual fuel supply ROJEK PK 20, 25, 30, 40, 49, 60. Tests shall be carried...
  • curprev 15:1415:14, 22 October 2020DG Regio talk contribs 11,018 bytes −957 Removed claim: summary (P836): The measurement and assessment of the decisive technical parameters of thermal and ecological installations, including their safety in operation. The output of tests from the test cell shall be the test report containing the subject of the tests, the certificate of the test (compliance with Government Regulation No. 163/2002 Coll.). ), for the following products: 1.Thermal insulation of solid fuel with manual fuel delivery ROJEK PK 20, 25, 30,...
  • curprev 07:1907:19, 22 October 2020DG Regio talk contribs 11,975 bytes +121 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:1907:19, 22 October 2020DG Regio talk contribs 11,854 bytes −121 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

6 June 2020

25 March 2020

26 February 2020

  • curprev 07:4307:43, 26 February 2020DG Regio talk contribs 10,684 bytes +957 Created claim: summary (P836): The measurement and assessment of the decisive technical parameters of thermal and ecological installations, including their safety in operation. The output of tests from the test cell shall be the test report containing the subject of the tests, the certificate of the test (compliance with Government Regulation No. 163/2002 Coll.). ), for the following products: 1.Thermal insulation of solid fuel with manual fuel delivery ROJEK PK 20, 25, 30, 4...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020