Revision history of "Improving the standard and quality of education in the municipality of Tuszów National through reconstruction and retrofitting of the educational base" (Q119342)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:3918:39, 8 October 2024DG Regio talk contribs 94,584 bytes −2 Changed label, description and/or aliases in pt
  • curprev 18:3918:39, 8 October 2024DG Regio talk contribs 94,586 bytes +91 Set a claim value: summary (P836): O principal objetivo do projeto é aumentar o nível e a qualidade da educação na área do Município Nacional de Tuszów através da reconstrução da base educativa, neste caso o Complexo Escolar de Maliń (gm. tinta nacional), a fim de aumentar a área educativa da escola e gerir novas instalações de aprendizagem e aumentar a acessibilidade e eliminar barreiras ao arquiteto para pessoas com deficiência. Além disso, um elemento importante do projeto consist...

7 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5319:53, 2 March 2023DG Regio talk contribs 91,321 bytes −287 Changed label, description and/or aliases in sk, it, da, lv, et, fi, el, cs, hr, sv, ro, pt, sl, fr, ga, lt, mt, hu, de, nl, bg, es, and other parts

27 October 2022

26 October 2022

20 October 2022

27 July 2022

  • curprev 14:5014:50, 27 July 2022DG Regio talk contribs 89,492 bytes +58,584 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 17,900 bytes +3,234 Created claim: summary (P836): L’objectif principal du projet est d’améliorer le niveau et la qualité de l’éducation dans la municipalité de Tuszów National grâce à la reconstruction de la base éducative, en l’occurrence le Complexe scolaire de Maliń (la municipalité de Tuszów national) afin d’accroître l’espace pédagogique de l’école et de développer de nouvelles installations d’apprentissage et d’accroître l’accessibilité et l’élimination des obstacles pour l’architecte. En...
  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 14,666 bytes +226 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:4416:44, 20 October 2020DG Regio talk contribs 14,879 bytes +211 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4416:44, 20 October 2020DG Regio talk contribs 14,668 bytes −208 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4416:44, 20 October 2020DG Regio talk contribs 14,876 bytes +2,907 Created claim: summary (P836): The main objective of the project is to increase the standard and quality of education in the area of the Tuszów National Municipality by rebuilding the educational base, in this case the School Complex in Maliń (gm. National ink) in order to increase the educational area of the school and to manage new learning facilities and to increase accessibility and eliminate barriers to architect. for people with disabilities. In addition, an important e...
  • curprev 16:4416:44, 20 October 2020DG Regio talk contribs 11,969 bytes −2,517 Removed claim: summary (P836): The main aim of the project is to increase the quality and quality of the training in the municipality of Tueszów Narodowy through the reconstruction of the educational base, in this case the School Complex (gm. Tueszów Narodowy) in order to increase the educational surface of the school and the new premises to learn, and to increase accessibility and remove barriers to architects. In addition, school equipment is an important part of the proj...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:3808:38, 10 March 2020DG Regio talk contribs 13,205 bytes +2,517 Created claim: summary (P836): The main aim of the project is to increase the quality and quality of the training in the municipality of Tueszów Narodowy through the reconstruction of the educational base, in this case the School Complex (gm. Tueszów Narodowy) in order to increase the educational surface of the school and the new premises to learn, and to increase accessibility and remove barriers to architects. In addition, school equipment is an important part of the projec...

24 February 2020

18 February 2020

31 January 2020

14 January 2020