Revision history of "IMPROVEMENT OF EDUCATIONAL INFRASTRUCTURE IN THE MUNICIPALITY OF PILZNO" (Q119302)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

26 October 2022

20 October 2022

2 July 2022

  • curprev 18:0318:03, 2 July 2022DG Regio talk contribs 53,004 bytes +32,546 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:0907:09, 2 December 2021DG Regio talk contribs 13,520 bytes +1,676 Created claim: summary (P836): Le projet d’agrandissement, de reconstruction du bâtiment de l’école, y compris la salle de gymnastique, la base et l’union et l’infrastructure technique nécessaire dans le complexe scolaire de Strzegocice, sera mis en œuvre en mode «conception et construction». Dans le cadre de ce projet, je prévois la mise en œuvre de tâches individuelles: 1) Expansion, reconstruction du bâtiment de l’école avec salle de gymnastique, base et union et infrastru...
  • curprev 07:0907:09, 2 December 2021DG Regio talk contribs 11,844 bytes +136 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:4316:43, 20 October 2020DG Regio talk contribs 12,147 bytes +130 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4316:43, 20 October 2020DG Regio talk contribs 12,017 bytes −129 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4316:43, 20 October 2020DG Regio talk contribs 12,146 bytes +1,643 Created claim: summary (P836): The project consisting of the extension, refurbishment of the school building together with the gym, facilities and transfer, as well as the necessary technical infrastructure in the School Complex in Strzegocice, will be implemented in the “design and build” mode. Within the framework of this project, I anticipate the implementation of individual tasks: 1) Expansion, reconstruction of the school building together with gymnastics room, facilitie...
  • curprev 16:4316:43, 20 October 2020DG Regio talk contribs 10,503 bytes −1,134 Removed claim: summary (P836): The project to expand the school building, together with the gymnasium, the hinterland and the peduncle and the necessary technical infrastructure in the School Complex in Strzelice, will be carried out under the ‘design and demolition’ procedure. This project provides for the implementation of specific tasks: (1) Construction, reconstruction of the school building with the gymnasium, the hinterland and the stalk and the necessary technical in...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:3808:38, 10 March 2020DG Regio talk contribs 10,348 bytes +1,134 Created claim: summary (P836): The project to expand the school building, together with the gymnasium, the hinterland and the peduncle and the necessary technical infrastructure in the School Complex in Strzelice, will be carried out under the ‘design and demolition’ procedure. This project provides for the implementation of specific tasks: (1) Construction, reconstruction of the school building with the gymnasium, the hinterland and the stalk and the necessary technical infr...

24 February 2020

18 February 2020

31 January 2020

14 January 2020