Revision history of "Improving the quality of the education system in Leżajsk through reconstruction and retrofitting of primary school No. 1" (Q119297)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3515:35, 7 October 2024DG Regio talk contribs 92,116 bytes −1 Changed label, description and/or aliases in pt
  • curprev 15:3515:35, 7 October 2024DG Regio talk contribs 92,117 bytes +95 Set a claim value: summary (P836): Âmbito dos investimentos: Edifício da Escola Básica n.o 1 – equipamento: fornecimento de equipamento TIC e de equipamento de ensino no domínio dos métodos modernos de aprendizagem para três salas de aula, reconstrução de telhados e tetos de madeira, obras de fachada, trabalhos de isolamento e reparação na parte «antiga» do edifício de ensino e obras elétricas com reparações em ambas as partes. As ajudas pedagógicas planeadas, incluindo as TIC, serão...

22 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5319:53, 2 March 2023DG Regio talk contribs 88,848 bytes −2,281 Changed label, description and/or aliases in lv, it, fr, da, ro, es, sk, bg, el, fi, sv, de, et, cs, hu, sl, pt, ga, lt, hr, mt, nl, and other parts

26 October 2022

20 October 2022

27 July 2022

  • curprev 14:4914:49, 27 July 2022DG Regio talk contribs 89,015 bytes +58,669 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:0907:09, 2 December 2021DG Regio talk contribs 17,694 bytes +3,138 Created claim: summary (P836): Portée de l’investissement: Bâtiment de l’école primaire no 1 — équipement: fourniture de matériel informatique et d’enseignement dans le domaine des méthodes modernes d’éducation pour trois salles de classe, reconstruction de la toiture et du plafond en bois, travaux de façade, travaux d’isolation et de réparation dans la partie «ancienne» du bâtiment d’enseignement, et travaux électriques avec réparation dans les deux parties. Les supports péd...
  • curprev 07:0907:09, 2 December 2021DG Regio talk contribs 14,556 bytes +187 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:4316:43, 20 October 2020DG Regio talk contribs 14,808 bytes +181 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4316:43, 20 October 2020DG Regio talk contribs 14,627 bytes −179 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4316:43, 20 October 2020DG Regio talk contribs 14,806 bytes +2,892 Created claim: summary (P836): Scope of investments: Building of Elementary School No. 1 – equipment: delivery of ICT equipment and teaching equipment in the field of modern learning methods for three classrooms, reconstruction of roof and wooden ceiling, facade works, insulation and repair work in the “old” part of the teaching building, and electrical works with repairs in both parts. Planned teaching aids, including ICT, will be an educational offer for students to inspire...
  • curprev 16:4316:43, 20 October 2020DG Regio talk contribs 11,914 bytes −2,341 Removed claim: summary (P836): Investment scope: Building Primary School No. 1 — Equipment: supply of ICT equipment and teaching facilities for modern training methods for three classes, conversion of prisoners and wooden ceilings, façade work, insulation and repair in the ‘old’ part of the teaching building, and electrical works with repairs in both parts. The planned teaching aids, including ICT, will provide students with an educational opportunity to inspire science and...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:3808:38, 10 March 2020DG Regio talk contribs 12,966 bytes +2,341 Created claim: summary (P836): Investment scope: Building Primary School No. 1 — Equipment: supply of ICT equipment and teaching facilities for modern training methods for three classes, conversion of prisoners and wooden ceilings, façade work, insulation and repair in the ‘old’ part of the teaching building, and electrical works with repairs in both parts. The planned teaching aids, including ICT, will provide students with an educational opportunity to inspire science and t...

24 February 2020

18 February 2020

31 January 2020

14 January 2020