Revision history of "Construction of kindergarten in Krasne" (Q119229)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:1918:19, 9 October 2024DG Regio talk contribs 85,066 bytes −34 Set a claim value: summary (P836): o investimento está também a melhorar a base pré-escolar, que satisfaz plenamente as necessidades dos residentes locais e de todo o município de Krasne, através da criação de novas instalações pré-escolares. A construção do novo jardim de infância é uma necessidade urgente devido às condições técnicas do atual edifício do jardim de infância e às condições de habitação limitadas, em consequência do facto de três infantários operarem atualmente no edi...

22 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

26 October 2022

20 October 2022

2 July 2022

  • curprev 18:0118:01, 2 July 2022DG Regio talk contribs 79,334 bytes +50,729 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:0907:09, 2 December 2021DG Regio talk contribs 16,899 bytes +2,996 Created claim: summary (P836): L’investissement vise également à améliorer la base préscolaire, répondant pleinement aux besoins des habitants du village et de l’ensemble de la municipalité de Krasne, en créant de nouveaux établissements préscolaires. La construction d’un nouveau jardin d’enfants est un besoin urgent en raison de l’état technique du bâtiment actuel et des conditions d’hébergement limitées, ce qui fait que trois unités de maternelle fonctionnent actuellement d...
  • curprev 07:0907:09, 2 December 2021DG Regio talk contribs 13,903 bytes +107 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:2816:28, 20 October 2020DG Regio talk contribs 14,235 bytes +97 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2816:28, 20 October 2020DG Regio talk contribs 14,138 bytes −107 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2816:28, 20 October 2020DG Regio talk contribs 14,245 bytes +2,678 Created claim: summary (P836): the investment is also improving the preschool base, which fully meets the needs of local residents and the whole municipality of Krasne, through the creation of new preschool facilities. The construction of the new kindergarten is an urgent need due to the technical condition of the current kindergarten building and the limited housing conditions, as a consequence of the fact that 3 nursery schools currently operate in the middle school buildin...
  • curprev 16:2816:28, 20 October 2020DG Regio talk contribs 11,567 bytes −2,218 Removed claim: summary (P836): the investment in progress is also improving the pre-school base, which fully meets the needs of the local population and the entire municipality of Krasne, through the creation of new pre-school facilities. The construction of a new nursery is a matter of urgency due to the technical state of the building in the current nursery school and the limited local conditions, with the consequence that 3 nursery units are currently running at the Gymn...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 09:4509:45, 10 March 2020DG Regio talk contribs 12,508 bytes +2,218 Created claim: summary (P836): the investment in progress is also improving the pre-school base, which fully meets the needs of the local population and the entire municipality of Krasne, through the creation of new pre-school facilities. The construction of a new nursery is a matter of urgency due to the technical state of the building in the current nursery school and the limited local conditions, with the consequence that 3 nursery units are currently running at the Gymnas...

24 February 2020

18 February 2020

31 January 2020

14 January 2020