Revision history of "Improvement of water and sewage management in Gorzyce Municipality through the extension of sanitary sewage system in the area of Gorzyce agglomeration and reconstruction of sewage treatment plant in Gorzyce" (Q118928)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1606:16, 9 October 2024DG Regio talk contribs 62,726 bytes +6 Changed label, description and/or aliases in pt
  • curprev 06:1606:16, 9 October 2024DG Regio talk contribs 62,720 bytes −29 Set a claim value: summary (P836): O principal objetivo do projeto é aumentar a população que beneficia de um sistema melhorado de tratamento de águas residuais urbanas, assegurando uma maior remoção de biogénio. O objetivo será alcançado através da construção de 5,7 km de rede de esgotos (incluindo 1,417 km de extensão inelegível da rede) e da reconstrução do tratamento de esgotos. Os investimentos realizados apoiam o principal objetivo de desenvolvimento da região, garantindo recur...

20 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5219:52, 2 March 2023DG Regio talk contribs 59,576 bytes +489 Changed label, description and/or aliases in lv, da, it, sk, fi, et, fr, ga, ro, es, el, de, hu, sv, bg, cs, mt, pt, sl, lt, nl, hr, and other parts

26 October 2022

20 October 2022

27 July 2022

  • curprev 14:4114:41, 27 July 2022DG Regio talk contribs 56,964 bytes +34,680 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:3207:32, 2 December 2021DG Regio talk contribs 14,132 bytes +1,721 Created claim: summary (P836): L’objectif principal du projet est d’accroître la population grâce à un système amélioré de traitement des eaux urbaines résiduaires, en assurant une élimination accrue des biogènes. L’objectif sera atteint par la construction de 5,7 km de réseau d’assainissement (dont 1,417 km de longueur non qualifiée du réseau) et la reconstruction du traitement des eaux usées.Les investissements réalisés soutiennent le principal objectif de développement de...
  • curprev 07:3207:32, 2 December 2021DG Regio talk contribs 12,411 bytes +321 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 17:2817:28, 20 October 2020DG Regio talk contribs 12,529 bytes +267 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:2817:28, 20 October 2020DG Regio talk contribs 12,262 bytes −288 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:2817:28, 20 October 2020DG Regio talk contribs 12,550 bytes +1,589 Created claim: summary (P836): The main objective of the project is to increase the population benefiting from an improved municipal waste water treatment system, ensuring increased biogen removal. The objective will be achieved through the construction of 5.7 km of sewage network (including 1.417 km of ineligible length of the network) and reconstruction of sewage treatment.Realised investments support the region’s main development goal by securing environmental resources an...
  • curprev 17:2817:28, 20 October 2020DG Regio talk contribs 10,961 bytes −1,316 Removed claim: summary (P836): The main objective of the project is to increase the population benefiting from an improved urban waste water treatment system, providing increased nutrient removal. The target will be reached through the construction of 5.7 km of sewerage network (including 1.417 km of non-eligible network length) and reconstruction of the effluent. Realised investments are the support of the region’s main development objective by securing environmental resou...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 11:0611:06, 10 March 2020DG Regio talk contribs 10,995 bytes −1,316 Removed claim: summary (P836): The main objective of the project is to increase the population benefiting from an improved urban waste water treatment system, providing increased nutrient removal. The target will be reached through the construction of 5.7 km of sewerage network (including 1.417 km of non-eligible network length) and reconstruction of the effluent. Realised investments are the support of the region’s main development objective by securing environmental resou...
  • curprev 09:4209:42, 10 March 2020DG Regio talk contribs 12,311 bytes +1,316 Created claim: summary (P836): The main objective of the project is to increase the population benefiting from an improved urban waste water treatment system, providing increased nutrient removal. The target will be reached through the construction of 5.7 km of sewerage network (including 1.417 km of non-eligible network length) and reconstruction of the effluent. Realised investments are the support of the region’s main development objective by securing environmental resourc...
  • curprev 09:3809:38, 10 March 2020DG Regio talk contribs 10,995 bytes +1,316 Created claim: summary (P836): The main objective of the project is to increase the population benefiting from an improved urban waste water treatment system, providing increased nutrient removal. The target will be reached through the construction of 5.7 km of sewerage network (including 1.417 km of non-eligible network length) and reconstruction of the effluent. Realised investments are the support of the region’s main development objective by securing environmental resourc...

24 February 2020

18 February 2020

31 January 2020

14 January 2020