Revision history of "“Expansion of the sewage treatment plant in Lipa with a pipeline of treated sewage”" (Q118908)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:2716:27, 10 October 2024DG Regio talk contribs 87,191 bytes −6 Changed label, description and/or aliases in pt
  • curprev 16:2716:27, 10 October 2024DG Regio talk contribs 87,197 bytes −19 Set a claim value: summary (P836): O principal objetivo do projeto «Expansão da estação de tratamento de águas residuais de Lipa com uma conduta de águas residuais tratadas» é melhorar a gestão das águas residuais no município de Zaklików. O projeto inclui a extensão da estação de tratamento de águas residuais de Lipa com uma conduta de águas residuais tratadas. A estação de tratamento de águas residuais existente, com uma capacidade de cerca de 150 m3/d, foi construída para servir a...

20 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 22:3822:38, 2 March 2023DG Regio talk contribs 84,042 bytes −259 Changed label, description and/or aliases in da, it, et, el, hu, lv, lt, fr, hr, es, pt, ga, ro, fi, sv, cs, de, nl, sl, mt, sk, bg, and other parts

26 October 2022

20 October 2022

27 July 2022

  • curprev 14:4114:41, 27 July 2022DG Regio talk contribs 82,181 bytes +53,100 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:3107:31, 2 December 2021DG Regio talk contribs 17,129 bytes +3,016 Created claim: summary (P836): L’objectif principal du projet «Expansion de la station d’épuration des eaux usées de Lipa avec le gazoduc d’eaux usées traitées» est d’améliorer la gestion des eaux usées dans la municipalité de Zaklików. Le projet comprend l’extension de la station d’épuration des eaux usées de Lipa, ainsi qu’un pipeline d’eaux usées traitées. Station de traitement des eaux résiduaires mécanique et biologique existante d’une capacité d’env. 150 m³/j ont été co...
  • curprev 07:3107:31, 2 December 2021DG Regio talk contribs 14,113 bytes +164 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 17:2817:28, 20 October 2020DG Regio talk contribs 14,388 bytes +146 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:2817:28, 20 October 2020DG Regio talk contribs 14,242 bytes −178 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:2817:28, 20 October 2020DG Regio talk contribs 14,420 bytes +2,629 Created claim: summary (P836): The main objective of the project “Expansion of waste water treatment plant in Lipa with a pipeline of treated sewage” is to improve waste water management in the municipality of Zaklików.The project includes the extension of the sewage treatment plant in Lipa with a pipeline of treated sewage. Existing sewage treatment plant with a capacity of approx. 150 m³/d was built to serve the canalised areas of Lipa. Scope of the project consisting of th...
  • curprev 17:2817:28, 20 October 2020DG Regio talk contribs 11,791 bytes −2,232 Removed claim: summary (P836): The main objective of the project “Extension of the waste water treatment plant in the municipality of Lip together with the waste water pipeline” is to improve the wastewater management in the municipality of Zaklików.This project involves the extension of the waste water treatment plant in the municipality of Lipa together with the waste water pipeline. Existing mechanical biological waste water treatment plant with capacity 150 m³/d was con...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 11:0611:06, 10 March 2020DG Regio talk contribs 12,735 bytes −2,232 Removed claim: summary (P836): The main objective of the project “Extension of the waste water treatment plant in the municipality of Lip together with the waste water pipeline” is to improve the wastewater management in the municipality of Zaklików.This project involves the extension of the waste water treatment plant in the municipality of Lipa together with the waste water pipeline. Existing mechanical biological waste water treatment plant with capacity 150 m³/d was con...
  • curprev 09:4209:42, 10 March 2020DG Regio talk contribs 14,967 bytes +2,232 Created claim: summary (P836): The main objective of the project “Extension of the waste water treatment plant in the municipality of Lip together with the waste water pipeline” is to improve the wastewater management in the municipality of Zaklików.This project involves the extension of the waste water treatment plant in the municipality of Lipa together with the waste water pipeline. Existing mechanical biological waste water treatment plant with capacity 150 m³/d was const...
  • curprev 09:3709:37, 10 March 2020DG Regio talk contribs 12,735 bytes +2,232 Created claim: summary (P836): The main objective of the project “Extension of the waste water treatment plant in the municipality of Lip together with the waste water pipeline” is to improve the wastewater management in the municipality of Zaklików.This project involves the extension of the waste water treatment plant in the municipality of Lipa together with the waste water pipeline. Existing mechanical biological waste water treatment plant with capacity 150 m³/d was const...

24 February 2020

18 February 2020

31 January 2020

14 January 2020