Revision history of "Construction of a gravitational sanitary sewer and pressure manifold with pumping stations in Kalniki – stage II" (Q118896)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 86,720 bytes +13 Changed label, description and/or aliases in pt
  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 86,707 bytes +86 Set a claim value: summary (P836): O principal objetivo do projeto é: regulamentação da gestão da água e dos esgotos através da extensão do sistema de esgotos sanitários no município de Stubno, em Kalniki. O objetivo do projeto proposto centra-se no combate à marginalização social e económica e na integração da área acima referida nos processos de desenvolvimento da região. O objetivo do projeto está em consonância com o objetivo da ação 4.3 do POR relativo à dimensão setentrional pa...

23 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 13:1013:10, 2 March 2023DG Regio talk contribs 83,447 bytes +465 Changed label, description and/or aliases in lv, it, sv, da, ro, fr, bg, sk, ga, et, de, fi, hu, nl, sl, mt, el, hr, es, lt, pt, cs, and other parts

26 October 2022

20 October 2022

27 July 2022

  • curprev 14:4014:40, 27 July 2022DG Regio talk contribs 80,868 bytes +52,329 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:3207:32, 2 December 2021DG Regio talk contribs 16,929 bytes +2,870 Created claim: summary (P836): L’objectif principal du projet est de: régulation de la gestion de l’eau et des eaux usées par l’extension du réseau d’assainissement sanitaire dans la municipalité de Stubno à Kalnik. L’objectif du projet proposé est de lutter contre la marginalisation sociale et économique et d’inclure la région dans les processus de développement. L’objectif du projet est conforme à l’objectif de la mesure 4.3 du ROP 2014-2020, à savoir: «Part accrue de la po...
  • curprev 07:3207:32, 2 December 2021DG Regio talk contribs 14,059 bytes +186 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 17:2717:27, 20 October 2020DG Regio talk contribs 14,312 bytes +174 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:2717:27, 20 October 2020DG Regio talk contribs 14,138 bytes −147 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:2717:27, 20 October 2020DG Regio talk contribs 14,285 bytes +2,608 Created claim: summary (P836): The main objective of the project is: regulation of water and sewage management through the extension of sanitary sewage system in the Stubno Municipality in Kalniki. The objective of the proposed Project focuses on combating social and economic marginalisation and integrating the above-mentioned area into the development processes of the region. The objective of the project is in line with the objective of action 4.3 of the ND ROP for the perio...
  • curprev 17:2717:27, 20 October 2020DG Regio talk contribs 11,677 bytes −2,121 Removed claim: summary (P836): The main objective of the project is to: regularisation of water and wastewater management by extending the sanitary sewage system in the municipality of Stubno in the town of Kalniki. The aim of the proposed Project focuses on addressing social and economic marginalisation and inclusion of the area in the region’s development processes. The project’s objective is in line with the objective of Action 4.3 of the 2014-2020 ROP PP: ‘A majority pr...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 11:0611:06, 10 March 2020DG Regio talk contribs 12,508 bytes −2,121 Removed claim: summary (P836): The main objective of the project is to: regularisation of water and wastewater management by extending the sanitary sewage system in the municipality of Stubno in the town of Kalniki. The aim of the proposed Project focuses on addressing social and economic marginalisation and inclusion of the area in the region’s development processes. The project’s objective is in line with the objective of Action 4.3 of the 2014-2020 ROP PP: ‘A majority pr...
  • curprev 09:4209:42, 10 March 2020DG Regio talk contribs 14,629 bytes +2,121 Created claim: summary (P836): The main objective of the project is to: regularisation of water and wastewater management by extending the sanitary sewage system in the municipality of Stubno in the town of Kalniki. The aim of the proposed Project focuses on addressing social and economic marginalisation and inclusion of the area in the region’s development processes. The project’s objective is in line with the objective of Action 4.3 of the 2014-2020 ROP PP: ‘A majority prop...
  • curprev 09:3709:37, 10 March 2020DG Regio talk contribs 12,508 bytes +2,121 Created claim: summary (P836): The main objective of the project is to: regularisation of water and wastewater management by extending the sanitary sewage system in the municipality of Stubno in the town of Kalniki. The aim of the proposed Project focuses on addressing social and economic marginalisation and inclusion of the area in the region’s development processes. The project’s objective is in line with the objective of Action 4.3 of the 2014-2020 ROP PP: ‘A majority prop...

24 February 2020

18 February 2020

31 January 2020

14 January 2020