Revision history of "Construction of sanitary sewage system with construction facilities in Olchowa and Sielec – agglomeration of Iwierzyce" (Q118891)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:1918:19, 9 October 2024DG Regio talk contribs 85,085 bytes +10 Changed label, description and/or aliases in pt
  • curprev 18:1918:19, 9 October 2024DG Regio talk contribs 85,075 bytes +76 Set a claim value: summary (P836): O principal objetivo do projeto é aumentar o número de domicílios com acesso a redes de saneamento. Número de objectos previstos para ligação: 359. Prazo de resposta: Setembro de 2018 Os objetivos específicos são 1) a proteção do ambiente através da eliminação da poluição sob a forma de efluentes no ecossistema, 2) a preservação da pureza das águas subterrâneas e a proteção do solo, assegurando a recolha de esgotos sanitários através da estação de t...

20 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 16:4016:40, 2 March 2023DG Regio talk contribs 81,825 bytes −4,760 Changed label, description and/or aliases in it, da, bg, sk, el, lv, ro, sl, ga, pt, cs, et, fi, de, hr, es, sv, lt, hu, nl, mt, fr, and other parts

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:5117:51, 2 July 2022DG Regio talk contribs 84,447 bytes +54,374 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:3207:32, 2 December 2021DG Regio talk contribs 17,566 bytes +3,163 Created claim: summary (P836): L’objectif principal du projet est d’augmenter le nombre de ménages ayant accès aux réseaux d’assainissement. Nombre d’objets prévus pour être connectés: 359. Date limite: Septembre 2018.Les objectifs spécifiques sont 1) la protection de l’environnement en éliminant l’entrée des polluants sous forme d’eaux usées dans l’écosystème, 2) la protection de la propreté des eaux souterraines et la protection des terres en assurant la collecte des eaux u...
  • curprev 07:3207:32, 2 December 2021DG Regio talk contribs 14,403 bytes +194 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 17:2717:27, 20 October 2020DG Regio talk contribs 14,648 bytes +180 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:2717:27, 20 October 2020DG Regio talk contribs 14,468 bytes −186 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:2717:27, 20 October 2020DG Regio talk contribs 14,654 bytes +2,764 Created claim: summary (P836): The main objective of the project is to increase the number of households with access to sanitation networks. Number of objects planned for connection: 359. Deadline for reply: September 2018 Specific objectives are 1) Protection of the environment by eliminating pollution in the form of effluents into the ecosystem, 2) Preserving the purity of groundwater and protecting the ground by ensuring the collection of sanitary sewage through the treatm...
  • curprev 17:2717:27, 20 October 2020DG Regio talk contribs 11,890 bytes −2,356 Removed claim: summary (P836): The main objective of the project is to increase the number of households with access to the sewer network. Number of objects to be connected: 359. Deadline: September 2018 Specific objectives 1) Protection of the environment by eliminating pollution from wastewater into the ecosystem, (2) Protection of groundwater and soil water cleaning by ensuring sewage treatment by the plant and then cleaning them, (3) Protection of soil and air in the mu...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 11:0611:06, 10 March 2020DG Regio talk contribs 12,956 bytes −2,356 Removed claim: summary (P836): The main objective of the project is to increase the number of households with access to the sewer network. Number of objects to be connected: 359. Deadline: September 2018 Specific objectives 1) Protection of the environment by eliminating pollution from wastewater into the ecosystem, (2) Protection of groundwater and soil water cleaning by ensuring sewage treatment by the plant and then cleaning them, (3) Protection of soil and air in the mu...
  • curprev 09:4109:41, 10 March 2020DG Regio talk contribs 15,312 bytes +2,356 Created claim: summary (P836): The main objective of the project is to increase the number of households with access to the sewer network. Number of objects to be connected: 359. Deadline: September 2018 Specific objectives 1) Protection of the environment by eliminating pollution from wastewater into the ecosystem, (2) Protection of groundwater and soil water cleaning by ensuring sewage treatment by the plant and then cleaning them, (3) Protection of soil and air in the muni...
  • curprev 09:3709:37, 10 March 2020DG Regio talk contribs 12,956 bytes +2,356 Created claim: summary (P836): The main objective of the project is to increase the number of households with access to the sewer network. Number of objects to be connected: 359. Deadline: September 2018 Specific objectives 1) Protection of the environment by eliminating pollution from wastewater into the ecosystem, (2) Protection of groundwater and soil water cleaning by ensuring sewage treatment by the plant and then cleaning them, (3) Protection of soil and air in the muni...

24 February 2020

18 February 2020

31 January 2020

14 January 2020