Revision history of "Reconstruction of thermal networks including exchange of central and central heating nodes for residential buildings 4a,4b,4c,4d,4e,4f,4 g in Zarzecz”" (Q118797)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 56,282 bytes +27 Changed label, description and/or aliases in pt
  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 56,255 bytes +96 Set a claim value: summary (P836): Em resultado do investimento previsto, serão realizados trabalhos relacionados com a modernização da rede de aquecimento existente pertencente à cooperativa de habitação de Zarzecz. O percurso previsto da rede de calor da rede de aquecimento central, da rede de aquecimento central e da rede de circulação corre ao longo do percurso da rede térmica existente do canal tradicional para desmantelamento. Está prevista a construção de novas redes a partir...

20 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5119:51, 2 March 2023DG Regio talk contribs 52,985 bytes −1,247 Changed label, description and/or aliases in lv, sk, it, da, fr, fi, cs, et, ga, pt, lt, bg, sl, hu, ro, hr, es, mt, sv, nl, el, de, and other parts

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4917:49, 2 July 2022DG Regio talk contribs 52,116 bytes +31,839 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:2407:24, 2 December 2021DG Regio talk contribs 13,358 bytes +1,552 Created claim: summary (P836): À la suite de l’investissement prévu, des travaux liés à la modernisation du réseau de chauffage urbain existant appartenant à la coopérative de logement de Zarzecz seront réalisés. L’itinéraire prévu des réseaux de chauffage, de chauffage central et de circulation suit l’itinéraire du réseau de chauffage traditionnel existant, destiné au démantèlement. Il est prévu de créer de nouveaux réseaux avec des tuyaux pré-isolés à la place de l’ancien r...
  • curprev 07:2407:24, 2 December 2021DG Regio talk contribs 11,806 bytes +235 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:5716:57, 20 October 2020DG Regio talk contribs 12,010 bytes +212 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5716:57, 20 October 2020DG Regio talk contribs 11,798 bytes −223 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5716:57, 20 October 2020DG Regio talk contribs 12,021 bytes +1,462 Created claim: summary (P836): As a result of the planned investment, works related to modernisation of the existing heating network belonging to the Housing Cooperative in Zarzecz will be carried out. The planned heat network route of the central heating network, central heating and circulation network runs along the route of the existing thermal network of traditional canal for dismantling. New networks are planned to be made from pre-insulated pipes in place of the old cha...
  • curprev 16:5716:57, 20 October 2020DG Regio talk contribs 10,559 bytes −996 Removed claim: summary (P836): As a result of the planned investment, work will be carried out in connection with the upgrading of the existing district heating network owned by the Housing Cooperative. The planned route of the heating network for secondary heating and cooling and circulation runs along the route of the existing district heating network to be dismantled. New networks are planned to be made from pre-insulated pipes instead of old duct network: 464 mb CO and...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 11:0411:04, 10 March 2020DG Regio talk contribs 10,265 bytes −996 Removed claim: summary (P836): As a result of the planned investment, work will be carried out in connection with the upgrading of the existing district heating network owned by the Housing Cooperative. The planned route of the heating network for secondary heating and cooling and circulation runs along the route of the existing district heating network to be dismantled. New networks are planned to be made from pre-insulated pipes instead of old duct network: 464 mb CO and...
  • curprev 09:4109:41, 10 March 2020DG Regio talk contribs 11,261 bytes +996 Created claim: summary (P836): As a result of the planned investment, work will be carried out in connection with the upgrading of the existing district heating network owned by the Housing Cooperative. The planned route of the heating network for secondary heating and cooling and circulation runs along the route of the existing district heating network to be dismantled. New networks are planned to be made from pre-insulated pipes instead of old duct network: 464 mb CO and 44...
  • curprev 09:3609:36, 10 March 2020DG Regio talk contribs 10,265 bytes +996 Created claim: summary (P836): As a result of the planned investment, work will be carried out in connection with the upgrading of the existing district heating network owned by the Housing Cooperative. The planned route of the heating network for secondary heating and cooling and circulation runs along the route of the existing district heating network to be dismantled. New networks are planned to be made from pre-insulated pipes instead of old duct network: 464 mb CO and 44...

24 February 2020

18 February 2020

31 January 2020

14 January 2020