Revision history of "Construction of a pre-insulated two-wire heating network together with two-function nodes for the “Panorama” Housing Estate in Polańczyk." (Q118790)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:3418:34, 8 October 2024DG Regio talk contribs 55,778 bytes −4 Changed label, description and/or aliases in pt
  • curprev 18:3418:34, 8 October 2024DG Regio talk contribs 55,782 bytes +153 Set a claim value: summary (P836): O objetivo do projeto é minimizar as perdas de energia que ocorrem nas transferências de calor, bem como reduzir as emissões de gases com efeito de estufa em resultado da conversão da antiga rede de canais no parque habitacional numa nova rede de dois tubos pré-isolada com ligações e permutadores de calor. O comprimento total da rede térmica modernizada no âmbito do projeto é de 828 mb, dos quais a rede principal é: Rede de 496 mb de ligações a edif...

20 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5119:51, 2 March 2023DG Regio talk contribs 52,455 bytes −2,625 Changed label, description and/or aliases in sk, da, it, lv, fi, sl, et, hr, ro, el, cs, sv, fr, hu, pt, lt, ga, es, de, nl, bg, mt, and other parts

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4817:48, 2 July 2022DG Regio talk contribs 52,971 bytes +32,461 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:2407:24, 2 December 2021DG Regio talk contribs 13,478 bytes +1,620 Created claim: summary (P836): L’objectif du projet est de réduire au minimum les pertes d’énergie dans le transport de chaleur, ainsi que de réduire les émissions de gaz à effet de serre grâce à la reconstruction de l’ancien réseau de gaines dans le lotissement en un nouveau réseau à double tube pré-isolé avec connexions et échangeurs de chaleur. La longueur totale du réseau thermique modernisé dans le cadre du projet est de 828 mb, dont le réseau principal est: 496 m réseau...
  • curprev 07:2407:24, 2 December 2021DG Regio talk contribs 11,858 bytes +218 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:5716:57, 20 October 2020DG Regio talk contribs 12,079 bytes +202 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5716:57, 20 October 2020DG Regio talk contribs 11,877 bytes −208 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5716:57, 20 October 2020DG Regio talk contribs 12,085 bytes +1,508 Created claim: summary (P836): The aim of the project is to minimise energy losses occurring on heat transfers, as well as to reduce greenhouse gas emissions as a result of the conversion of the old canal network on the housing estate into a new two-tube network pre-insulated with connections and heat exchangers. The total length of the thermal grid upgraded within the project is 828 mb, of which the main network is: 496 mb network of connections to buildings: It’s 332 mb. Th...
  • curprev 16:5716:57, 20 October 2020DG Regio talk contribs 10,577 bytes −991 Removed claim: summary (P836): The aim of the project is to minimise heat losses for the transmission of heat as well as the reduction of greenhouse gas emissions as a result of the conversion of old ducts into a new two-pipe network, preinsulated with connections and heat exchangers. The total length of the thermal grid modernised by the project is 828 mb of which the main network is: 496 ml network of connections to buildings: 332 mb. In buildings, district heating hubs w...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 11:0411:04, 10 March 2020DG Regio talk contribs 10,272 bytes −991 Removed claim: summary (P836): The aim of the project is to minimise heat losses for the transmission of heat as well as the reduction of greenhouse gas emissions as a result of the conversion of old ducts into a new two-pipe network, preinsulated with connections and heat exchangers. The total length of the thermal grid modernised by the project is 828 mb of which the main network is: 496 ml network of connections to buildings: 332 mb. In buildings, district heating hubs w...
  • curprev 09:4109:41, 10 March 2020DG Regio talk contribs 11,263 bytes +991 Created claim: summary (P836): The aim of the project is to minimise heat losses for the transmission of heat as well as the reduction of greenhouse gas emissions as a result of the conversion of old ducts into a new two-pipe network, preinsulated with connections and heat exchangers. The total length of the thermal grid modernised by the project is 828 mb of which the main network is: 496 ml network of connections to buildings: 332 mb. In buildings, district heating hubs wil...
  • curprev 09:3609:36, 10 March 2020DG Regio talk contribs 10,272 bytes +991 Created claim: summary (P836): The aim of the project is to minimise heat losses for the transmission of heat as well as the reduction of greenhouse gas emissions as a result of the conversion of old ducts into a new two-pipe network, preinsulated with connections and heat exchangers. The total length of the thermal grid modernised by the project is 828 mb of which the main network is: 496 ml network of connections to buildings: 332 mb. In buildings, district heating hubs wil...

24 February 2020

18 February 2020

31 January 2020

14 January 2020