Revision history of "Thermomodernisation of public utility facilities in the Pahazia Municipality" (Q118719)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:4115:41, 7 October 2024DG Regio talk contribs 93,257 bytes +13 Changed label, description and/or aliases in pt
  • curprev 15:4115:41, 7 October 2024DG Regio talk contribs 93,244 bytes −12 Set a claim value: summary (P836): O objetivo do projeto é melhorar a pureza do ar no edifício. Reduzir a poluição na atmosfera e aumentar a eficiência energética dos edifícios. Projeto de modernização energética com a substituição da iluminação de 4 edifícios públicos no edifício. No edifício da escola secundária em Kidałowice está previsto: isolamento das paredes e teto do sótão, modernização do sistema de troca de CO da caldeira a gás e montagem CWU da bomba de calor, substituição...

20 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

3 November 2022

26 October 2022

20 October 2022

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1607:16, 2 December 2021DG Regio talk contribs 17,858 bytes +3,348 Created claim: summary (P836): L’objectif du projet est d’améliorer la propreté de l’air à Pavłosiów en réduisant la pollution atmosphérique et en améliorant l’efficacité énergétique des bâtiments. Projet de modernisation énergétique avec remplacement de l’éclairage pour 4 bâtiments publics à Pawłosiów. Les projets suivants sont prévus dans le bâtiment de l’école secondaire à Kidałowice: isolation des murs et du plafond du grenier, modernisation du système de remplacement de...
  • curprev 07:1607:16, 2 December 2021DG Regio talk contribs 14,510 bytes +136 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:5216:52, 20 October 2020DG Regio talk contribs 14,813 bytes +135 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5216:52, 20 October 2020DG Regio talk contribs 14,678 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5216:52, 20 October 2020DG Regio talk contribs 14,811 bytes +2,998 Created claim: summary (P836): The aim of the project is to improve air purity in the building. Pahairs by reducing pollution into the atmosphere and increasing the energy efficiency of buildings. Project for energy modernisation with the replacement of lighting 4 public buildings in the building. In the branch school building in Kidałowice it is planned: insulation of the walls and ceiling of the attic, modernisation of the CO-exchange system of gas boiler and CWU-assembly o...
  • curprev 16:5216:52, 20 October 2020DG Regio talk contribs 11,813 bytes −2,458 Removed claim: summary (P836): The aim of the project is to improve the quality of air in the city of Pawłosides by reducing atmospheric pollution and improving the energy efficiency of buildings. Energy modernisation project with the replacement of 4 public buildings in the city of Pawłosów. The following are scheduled in the building of the Kidalowice school building: insulation of walls and costumes, modernisation of the CO-replacement of the gas boiler and CWU-installat...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5508:55, 10 March 2020DG Regio talk contribs 12,983 bytes +2,458 Created claim: summary (P836): The aim of the project is to improve the quality of air in the city of Pawłosides by reducing atmospheric pollution and improving the energy efficiency of buildings. Energy modernisation project with the replacement of 4 public buildings in the city of Pawłosów. The following are scheduled in the building of the Kidalowice school building: insulation of walls and costumes, modernisation of the CO-replacement of the gas boiler and CWU-installatio...

24 February 2020

18 February 2020

31 January 2020

14 January 2020