Revision history of "Software support for calculating the time consuming of a specific production division" (Q11870)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

11 June 2023

17 February 2023

2 July 2022

  • curprev 17:4717:47, 2 July 2022DG Regio talk contribs 44,973 bytes +25,395 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

12 December 2021

2 December 2021

  • curprev 07:5707:57, 2 December 2021DG Regio talk contribs 15,433 bytes +1,233 Created claim: summary (P836): Inhalt des Projekts ist die Erstellung von Softwareunterstützung für die Berechnung des Zeitverbrauchs von Produktionsvorgängen, die dann in den Produktionsprozess umgesetzt werden. Die Einführung eines Berechnungsmodells in das Produktionssystem des Unternehmens wird zu einer effizienteren Produktion, einer verbesserten Produktionsplanung und einer Gesamtsteigerung der Produktion des Unternehmens führen., translated_summary
  • curprev 07:5707:57, 2 December 2021DG Regio talk contribs 14,200 bytes +150 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 09:1809:18, 28 November 2021DG Regio talk contribs 14,050 bytes +1,267 Created claim: summary (P836): Le contenu du projet est la création d’un support logiciel pour le calcul de la consommation de temps des opérations de production, qui sera ensuite mis en œuvre dans le processus de production. L’introduction d’un modèle de calcul dans le système de production de l’entreprise conduira à une production plus efficace, à une meilleure planification de la production et à une augmentation globale de la production de l’entreprise., translated_summary
  • curprev 09:1809:18, 28 November 2021DG Regio talk contribs 12,783 bytes +142 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 15:0315:03, 22 October 2020DG Regio talk contribs 13,090 bytes +1,193 Created claim: summary (P836): The content of the project is to create software support for calculating the time consuming of production operations, which will then be implemented into the production process. By introducing a computational model into the company’s production system, it will improve production efficiency, improve production planning and increase the company’s production overall. a., translated_summary
  • curprev 15:0315:03, 22 October 2020DG Regio talk contribs 11,897 bytes −732 Removed claim: summary (P836): The content of the project is to create a software support to calculate the time intensity of manufacturing operations, which will then be implemented in the production process. By introducing the calculation model in the company’s production system, it will make production more efficient, improve the production planning and improve the company’s output., remove_old_english_translation
  • curprev 07:0907:09, 22 October 2020DG Regio talk contribs 12,629 bytes +144 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:0907:09, 22 October 2020DG Regio talk contribs 12,485 bytes −141 Changed label, description and/or aliases in 1 language: remove_english_label

22 September 2020

15 July 2020

6 June 2020

25 March 2020

26 February 2020

  • curprev 07:3707:37, 26 February 2020DG Regio talk contribs 11,347 bytes +732 Created claim: summary (P836): The content of the project is to create a software support to calculate the time intensity of manufacturing operations, which will then be implemented in the production process. By introducing the calculation model in the company’s production system, it will make production more efficient, improve the production planning and improve the company’s output., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020