Revision history of "Thermomodernisation of three public buildings with heat exchange and installation of renewable energy sources in the Radmno commune" (Q118681)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:3418:34, 8 October 2024DG Regio talk contribs 90,496 bytes −27 Changed label, description and/or aliases in pt
  • curprev 18:3418:34, 8 October 2024DG Regio talk contribs 90,523 bytes −1,041 Set a claim value: summary (P836): O principal objetivo do projeto é reduzir o consumo de energia final/primária, reduzir os custos de produção de calor e eletricidade nos edifícios abrangidos pelo projeto, a produção de eletricidade/energia quente a partir de FER e reduzir a quantidade de poluentes na atmosfera. Na ZS em Łazy está previsto:-aumento do aquecimento do piso sob o sótão-482,00 m2-aquecimento das paredes externas.-524,6 m2-aumento do piso no chão-482,00 m2-modernização d...

22 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5019:50, 2 March 2023DG Regio talk contribs 88,390 bytes +15,305 Changed label, description and/or aliases in lv, da, it, bg, et, sk, ro, hr, sv, fr, es, pt, de, lt, hu, ga, nl, sl, el, fi, mt, cs, and other parts

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4617:46, 2 July 2022DG Regio talk contribs 70,968 bytes +39,996 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1607:16, 2 December 2021DG Regio talk contribs 17,055 bytes +3,441 Created claim: summary (P836): L’objectif principal du projet est de réduire la consommation d’énergie finale/primaire, de réduire les coûts de production de chaleur et d’électricité dans les bâtiments couverts par le projet, de produire de l’énergie électrique/chauffante à partir des SER et de réduire la quantité de polluants dans l’atmosphère. Le projet de thermomodernisation ainsi que le remplacement de la source de chaleur et l’installation de bâtiments RES 3 utilisant le...
  • curprev 07:1607:16, 2 December 2021DG Regio talk contribs 13,614 bytes +236 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:5116:51, 20 October 2020DG Regio talk contribs 13,817 bytes +191 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5116:51, 20 October 2020DG Regio talk contribs 13,626 bytes −243 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5116:51, 20 October 2020DG Regio talk contribs 13,869 bytes +1,899 Created claim: summary (P836): The main objective of the project is to reduce final/primary energy consumption, reduce the costs of heat and electricity generation in the buildings covered by the project, generation of electricity/warm energy from RES and reduce the amount of pollutants into the atmosphere. In the ZS in Łazy it is planned:-increasing floor warming under the attic-482.00 m²-warming of the outer walls.-524.6 m²-increase of flooring on the ground-482.00 m²-moder...
  • curprev 16:5116:51, 20 October 2020DG Regio talk contribs 11,970 bytes −2,146 Removed claim: summary (P836): The main objective of the project is a reduction in final/primary energy consumption, a reduction in the cost of generating heat and electricity in the construction project, the production of electricity from RES and the reduction of atmospheric pollutants. ZS in Laami, ZS in Ostrów, ZS Korczowa building in Młnachch.In ZS, in Łazko, is designed to heat up the floor to 482.00 m² — for heating — 482.00 m² — for heating the floor on land — 524.6 ...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5408:54, 10 March 2020DG Regio talk contribs 12,826 bytes +2,146 Created claim: summary (P836): The main objective of the project is a reduction in final/primary energy consumption, a reduction in the cost of generating heat and electricity in the construction project, the production of electricity from RES and the reduction of atmospheric pollutants. ZS in Laami, ZS in Ostrów, ZS Korczowa building in Młnachch.In ZS, in Łazko, is designed to heat up the floor to 482.00 m² — for heating — 482.00 m² — for heating the floor on land — 524.6 m²...

24 February 2020

18 February 2020

31 January 2020

14 January 2020