Revision history of "Thermal modernisation of the buildings of the Care and Medical Department/Hospice in Przemyśl" (Q118665)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1606:16, 9 October 2024DG Regio talk contribs 86,170 bytes +1 Changed label, description and/or aliases in pt
  • curprev 06:1606:16, 9 October 2024DG Regio talk contribs 86,169 bytes −99 Set a claim value: summary (P836): O principal objetivo do projeto é reduzir a procura de energia térmica e reduzir os custos de funcionamento dos edifícios n.os 5 e 2 do Departamento de Cuidados e Medicina da ul. Slovak 85 em Przemyśl. O objetivo será alcançado através de:- no edifício 5: isolamento das paredes exteriores; isolamento das paredes de fundação da parte A; aquecimento dos pisos no rés-do-chão, parte A, do rés-do-chão baixo; aquecimento dos tectos parte A sob o piso térr...

7 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 13:0913:09, 2 March 2023DG Regio talk contribs 83,094 bytes +49 Changed label, description and/or aliases in lv, it, sv, da, ro, fr, bg, sk, ga, et, de, cs, nl, sl, mt, el, hr, es, lt, pt, fi, hu, and other parts

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4617:46, 2 July 2022DG Regio talk contribs 80,931 bytes +51,696 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1507:15, 2 December 2021DG Regio talk contribs 17,001 bytes +2,983 Created claim: summary (P836): L’objectif principal du projet est de réduire les besoins en énergie thermique et de réduire les coûts d’exploitation des bâtiments nos 5 et 2 du Département des soins et du traitement/Hospice à ul. Slovaque 85 à Przemyśl. L’objectif sera atteint par la mise en œuvre de:- dans le bâtiment 5: isolation des murs extérieurs; isolation des murs de fondation de la partie A; réchauffement du sol sur la partie A du rez-de-chaussée; partie de réchauffem...
  • curprev 07:1507:15, 2 December 2021DG Regio talk contribs 14,018 bytes +143 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:5116:51, 20 October 2020DG Regio talk contribs 14,314 bytes +153 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5116:51, 20 October 2020DG Regio talk contribs 14,161 bytes −143 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5116:51, 20 October 2020DG Regio talk contribs 14,304 bytes +2,655 Created claim: summary (P836): The main objective of the project is to reduce the demand for thermal energy and reduce the operating costs of buildings no.5 and 2 of the Care and Medical Department/Hospice at ul. Slovak 85 in Przemyśl. The objective will be achieved by:- in building 5: insulation of the outer walls; insulation of the foundation walls of Part A; warming of floors on the ground floor part A of the low ground floor; warming of the ceilings part A under the low g...
  • curprev 16:5116:51, 20 October 2020DG Regio talk contribs 11,649 bytes −2,177 Removed claim: summary (P836): The main objective of the project is to reduce the demand for heat and to reduce the operating costs of buildings No 5 and No 2 at ul. Slovak 85 in Przemyśl. The objective will be achieved through implementation: — in Building 5: the warming of external walls; the warming of the core walls of Part A; the warming of the floors on the ground of part A of the low ground floor; the warming of the part A under the low ground floor (basement); repla...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5008:50, 10 March 2020DG Regio talk contribs 12,542 bytes +2,177 Created claim: summary (P836): The main objective of the project is to reduce the demand for heat and to reduce the operating costs of buildings No 5 and No 2 at ul. Slovak 85 in Przemyśl. The objective will be achieved through implementation: — in Building 5: the warming of external walls; the warming of the core walls of Part A; the warming of the floors on the ground of part A of the low ground floor; the warming of the part A under the low ground floor (basement); replace...

24 February 2020

18 February 2020

31 January 2020

14 January 2020