Revision history of "Thermal modernisation of the building of the Public School Complex in Kopytowa" (Q118652)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1606:16, 9 October 2024DG Regio talk contribs 84,622 bytes +4 Changed label, description and/or aliases in pt
  • curprev 06:1606:16, 9 October 2024DG Regio talk contribs 84,618 bytes −772 Set a claim value: summary (P836): O projeto tem por objeto a modernização térmica de uma instalação – o edifício da Escola Primária João Paulo II (SP) em Kopytowa, com uma área de 1729,32 m2, incluindo obras de construção e instalação, ou seja:- Termomodernização das divisões verticais de edifícios; —modernização térmica de divisórias horizontais; —conversão da carpintaria interior — instalação de novas portas exteriores, instalação de novas janelas, incluindo a substituição das sol...

7 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

26 October 2022

20 October 2022

27 July 2022

  • curprev 14:3714:37, 27 July 2022DG Regio talk contribs 70,367 bytes +42,822 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1907:19, 2 December 2021DG Regio talk contribs 16,432 bytes +2,947 Created claim: summary (P836): L’objet du projet est la thermomodernisation d’un bâtiment — la construction de l’école primaire Jean-Paul II (SP) à Kopytowa d’une superficie de 1 729,32 m², y compris les travaux de construction et d’installation, c’est-à-dire:- la thermomodernisation des cloisons verticales de bâtiments; —thermommodernisation des cloisons horizontales de bâtiment; —remplacement de la menuiserie d’ouverture — installation de nouvelles portes extérieures, insta...
  • curprev 07:1807:18, 2 December 2021DG Regio talk contribs 13,485 bytes +137 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:3416:34, 20 October 2020DG Regio talk contribs 13,787 bytes +137 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3416:34, 20 October 2020DG Regio talk contribs 13,650 bytes −139 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3416:34, 20 October 2020DG Regio talk contribs 13,789 bytes +2,094 Created claim: summary (P836): The subject of the project is the thermal modernisation of 1 facility – the John Paul II Primary School (SP) building in Kopytowa with an area of 1729.32 m², including construction and installation works, i.e.:- Thermomodernisation of vertical building divisions; —thermal modernisation of horizontal partitions; —conversion of the interior carpentry – installation of new external doors, installation of new windows, including replacement of window...
  • curprev 16:3416:34, 20 October 2020DG Regio talk contribs 11,695 bytes −2,220 Removed claim: summary (P836): The project is the thermo-modernisation of the 1 site — the building at the John II Primary School in Kopytowa in the area of 1 729.32 m², which includes construction and installation works, i.e. — thermal modernisation of vertical construction divisions; Renovation of horizontal building blocks; — replacement of open-door joinery — installation of new external doors, installation of new windows, including replacement of umbrella lines, includ...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5008:50, 10 March 2020DG Regio talk contribs 12,632 bytes +2,220 Created claim: summary (P836): The project is the thermo-modernisation of the 1 site — the building at the John II Primary School in Kopytowa in the area of 1 729.32 m², which includes construction and installation works, i.e. — thermal modernisation of vertical construction divisions; Renovation of horizontal building blocks; — replacement of open-door joinery — installation of new external doors, installation of new windows, including replacement of umbrella lines, includin...

24 February 2020

18 February 2020

31 January 2020

14 January 2020