Revision history of "Energy reconstruction and modernisation of the Prosectorium of the District Specialist Hospital in Stalowa Wola" (Q118632)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

3 March 2023

  • curprev 00:5700:57, 3 March 2023DG Regio talk contribs 85,580 bytes +147 Changed label, description and/or aliases in da, it, sk, hr, et, fi, de, ro, hu, sv, es, pt, lv, lt, cs, ga, nl, fr, sl, bg, mt, el, and other parts

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4517:45, 2 July 2022DG Regio talk contribs 83,313 bytes +54,283 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1807:18, 2 December 2021DG Regio talk contribs 17,124 bytes +2,923 Created claim: summary (P836): L’objectif principal du projet est de réduire la demande d’énergie de 73 %, liée à une réduction des émissions de gaz à effet de serre de 45,67 Mg/an et de particules PM-10 de 35,93 kg/an grâce à l’utilisation du bâtiment autonome. Pour ce faire, la thermomodernisation comprendra: Réchauffement du plafond sous le grenier non chauffé et les murs extérieurs. Mise en œuvre d’isolation thermique et anti-humidité des murs de fondation. Remplacement d...
  • curprev 07:1807:18, 2 December 2021DG Regio talk contribs 14,201 bytes +188 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 14,452 bytes +171 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 14,281 bytes −164 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 14,445 bytes +2,715 Created claim: summary (P836): The main objective of the project is to reduce energy demand by 73 %, linked to a reduction of 45.67 Mg/year greenhouse gas emissions and PM-10 dusts by 35.93 kg/year as a result of the use of the prosectorium building. It will be achieved by a thermo-modernisation involving: Warming the ceiling under the unheated attic and the zipper walls. Manufacture of damp and thermal insulation of the foundation walls. Replacement of 5 old doors and 7 old...
  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 11,730 bytes −1,980 Removed claim: summary (P836): The main objective of the project is to reduce energy demand by 73 %, linked to the reduction of greenhouse gas emissions by 45,67 tonnes/year and to particulate matter PM-10 by 35.93 kg/year as a result of the use of the protorium building. It will be achieved through a thermal modernisation consisting of: Heating of the ceiling for non-heated attainments and walls. Insulation insulation and fundamental wall insulation. Exchange of 5 old door...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5008:50, 10 March 2020DG Regio talk contribs 12,425 bytes +1,980 Created claim: summary (P836): The main objective of the project is to reduce energy demand by 73 %, linked to the reduction of greenhouse gas emissions by 45,67 tonnes/year and to particulate matter PM-10 by 35.93 kg/year as a result of the use of the protorium building. It will be achieved through a thermal modernisation consisting of: Heating of the ceiling for non-heated attainments and walls. Insulation insulation and fundamental wall insulation. Exchange of 5 old doors...

24 February 2020

18 February 2020

31 January 2020

14 January 2020