Revision history of "Thermal modernisation of public buildings: OSP Dynów at ul. Bartkówka, OSP Dynów at ul. School, Elementary School No. 2 at ul. Bartkówka in Dynowo, building of the Municipal Office in Dynowo" (Q118622)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:4115:41, 7 October 2024DG Regio talk contribs 94,133 bytes −9 Changed label, description and/or aliases in pt
  • curprev 15:4115:41, 7 October 2024DG Regio talk contribs 94,142 bytes −240 Set a claim value: summary (P836): O objetivo do projeto é melhorar a eficiência dos edifícios públicos em Dynowa para o nível de construção energeticamente eficiente com a introdução simultânea de um sistema de gestão de energia. No âmbito do projeto, serão modernizados termicamente quatro edifícios de utilidade pública, ou seja, dois edifícios OSP, a Escola Primária e o edifício de escritórios municipais em Dynowo. O edifício do Gabinete Municipal incluirá isolamento térmico das pa...

20 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 16:5016:50, 2 March 2023DG Regio talk contribs 91,208 bytes +3,281 Changed label, description and/or aliases in da, lv, it, sk, sl, pt, fi, et, sv, de, hu, fr, ro, bg, lt, el, mt, hr, cs, es, ga, nl, and other parts

26 October 2022

20 October 2022

27 July 2022

  • curprev 14:3614:36, 27 July 2022DG Regio talk contribs 85,804 bytes +55,262 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1807:18, 2 December 2021DG Regio talk contribs 17,725 bytes +3,164 Created claim: summary (P836): L’objectif du projet est d’améliorer l’efficacité des bâtiments publics de Dynów au niveau des bâtiments économes en énergie, avec l’introduction simultanée du système de gestion de l’énergie. Dans le cadre du projet, 4 bâtiments publics seront thermomodernisés, à savoir deux bâtiments du GRT, l’école primaire et la construction de l’hôtel de ville de Dynów. Le bâtiment de l’hôtel de ville comprendra l’isolation thermique des murs extérieurs et...
  • curprev 07:1807:18, 2 December 2021DG Regio talk contribs 14,561 bytes +252 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 14,748 bytes +254 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 14,494 bytes −252 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 14,746 bytes +2,767 Created claim: summary (P836): The aim of the project is to improve the efficiency of public buildings in Dynowa to the level of energy-efficient construction with the simultaneous introduction of an energy management system. Within the framework of the project, 4 public utility buildings, i.e. two OSP buildings, Primary School and the Municipal Office building in Dynowo will be thermally modernised. The building of the Municipal Office will include thermal insulation of exte...
  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 11,979 bytes −2,334 Removed claim: summary (P836): The aim of the project is to improve the efficiency of public buildings in the Dynów in the construction of energy-efficient buildings with the simultaneous introduction of an energy management system. The project will undergo thermal modernisation of 4 public utility buildings, i.e. two buildings of the TSO, the Primary School and the Urban Office in the Dynów. The Urban Authority building will include, inter alia, thermal insulation of exter...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5008:50, 10 March 2020DG Regio talk contribs 13,037 bytes +2,334 Created claim: summary (P836): The aim of the project is to improve the efficiency of public buildings in the Dynów in the construction of energy-efficient buildings with the simultaneous introduction of an energy management system. The project will undergo thermal modernisation of 4 public utility buildings, i.e. two buildings of the TSO, the Primary School and the Urban Office in the Dynów. The Urban Authority building will include, inter alia, thermal insulation of externa...

24 February 2020

18 February 2020

31 January 2020

14 January 2020