Revision history of "Construction of a photovoltaic farm by the company BRT sp. z o.o." (Q118613)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1606:16, 9 October 2024DG Regio talk contribs 67,712 bytes +15 Changed label, description and/or aliases in pt
  • curprev 06:1606:16, 9 October 2024DG Regio talk contribs 67,697 bytes −173 Set a claim value: summary (P836): O objetivo do projeto é aumentar a quantidade de energia produzida a partir de fontes renováveis e, consequentemente, melhorar a qualidade e a proteção do ambiente, reduzir as emissões de gases com efeito de estufa para a atmosfera. O projeto diz respeito à construção de uma exploração fotovoltaica com as infraestruturas necessárias em Jabłonka. Parâmetros fundamentais da instalação fotovoltaica: 1. Potência-199.68 kW 2.Produção de eletricidade a pa...

20 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4517:45, 2 July 2022DG Regio talk contribs 61,162 bytes +37,281 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1807:18, 2 December 2021DG Regio talk contribs 14,829 bytes +2,276 Created claim: summary (P836): L’objectif du projet est d’augmenter la quantité d’énergie produite à partir de sources renouvelables, améliorant ainsi la qualité et la protection de l’environnement et réduisant les émissions de gaz à effet de serre dans l’atmosphère. Le projet concerne la construction d’une ferme photovoltaïque dotée des infrastructures nécessaires à Jabłonka. Paramètres de base de l’installation photovoltaïque: 1. Puissance-199,68 kW 2.Production d’électrici...
  • curprev 07:1807:18, 2 December 2021DG Regio talk contribs 12,553 bytes +120 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 12,872 bytes +124 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 12,748 bytes −126 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 12,874 bytes +1,855 Created claim: summary (P836): The aim of the project is to increase the amount of energy generated from renewable sources and, as a result, improve the quality and protection of the environment, reduce greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic farm with the necessary infrastructure in Jabłonka. Basic parameters of the photovoltaic installation: 1. Power-199.68 kW 2.Production of electricity from newly built RES inst...
  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 11,019 bytes −1,546 Removed claim: summary (P836): The project aims at increasing the amount of energy from renewable sources and, as a result, improving the quality and protection of the environment, reducing greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic farm together with the necessary infrastructure in Jabłonka. Basic parameters of the photovoltaic installation: 1. Moc-199.68 kW 2.Production of electricity from newly constructed RES in...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5008:50, 10 March 2020DG Regio talk contribs 11,276 bytes +1,546 Created claim: summary (P836): The project aims at increasing the amount of energy from renewable sources and, as a result, improving the quality and protection of the environment, reducing greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic farm together with the necessary infrastructure in Jabłonka. Basic parameters of the photovoltaic installation: 1. Moc-199.68 kW 2.Production of electricity from newly constructed RES inst...

24 February 2020

18 February 2020

31 January 2020

14 January 2020