Revision history of "Construction of a photovoltaic farm in Błędowa Tyczyńska" (Q118608)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4517:45, 2 July 2022DG Regio talk contribs 61,472 bytes +37,514 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1807:18, 2 December 2021DG Regio talk contribs 14,843 bytes +2,282 Created claim: summary (P836): L’objectif du projet est d’augmenter la quantité d’énergie produite à partir de sources renouvelables, améliorant ainsi la qualité et la protection de l’environnement et réduisant les émissions de gaz à effet de serre dans l’atmosphère. Le projet concerne la construction d’une ferme photovoltaïque dotée des infrastructures nécessaires à Błędowa Tyczyńska. Paramètres de base de l’installation photovoltaïque: 1. Puissance-199,68 kW 2. Production d...
  • curprev 07:1807:18, 2 December 2021DG Regio talk contribs 12,561 bytes +125 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 12,875 bytes +118 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 12,757 bytes −119 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 12,876 bytes +1,868 Created claim: summary (P836): The aim of the project is to increase the amount of energy generated from renewable sources and, as a result, improve the quality and protection of the environment, reduce greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic farm with the necessary infrastructure in Błędowa Tyczyńska. Basic parameters of the photovoltaic installation: 1. Power-199.68 kW 2. Electricity production from newly built R...
  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 11,008 bytes −1,555 Removed claim: summary (P836): The project aims at increasing the amount of energy from renewable sources and, as a result, improving the quality and protection of the environment, reducing greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic farm together with the necessary infrastructure in the Tyczyńska. Basic parameters of the photovoltaic installation: 1. Moc-199.68 kW 2. Production of electricity from newly built RES in...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5008:50, 10 March 2020DG Regio talk contribs 11,274 bytes +1,555 Created claim: summary (P836): The project aims at increasing the amount of energy from renewable sources and, as a result, improving the quality and protection of the environment, reducing greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic farm together with the necessary infrastructure in the Tyczyńska. Basic parameters of the photovoltaic installation: 1. Moc-199.68 kW 2. Production of electricity from newly built RES inst...

24 February 2020

18 February 2020

31 January 2020

14 January 2020