Revision history of "Construction of the photovoltaic farm Markowizna with a capacity of 1,98 MW together with technical infrastructure – Stages I and II" (Q118605)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 50,724 bytes 0 Changed label, description and/or aliases in pt
  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 50,724 bytes +2 Set a claim value: summary (P836): O principal objetivo do projeto é aumentar a produção de energia a partir de fontes renováveis, melhorar a qualidade do ar e proteger os combustíveis fósseis, bem como reduzir as emissões de CO2 para a atmosfera.Em resultado do projeto, serão construídas duas instalações de células fotovoltaicas com uma capacidade de 0,99 MW cada.Em resultado do projeto, uma exploração fotovoltaica com uma capacidade total de 1,98 MW produzirá 1782,00 MWh de eletric...

22 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5019:50, 2 March 2023DG Regio talk contribs 47,536 bytes −457 Changed label, description and/or aliases in lv, it, da, bg, sk, ro, et, de, pt, cs, sv, ga, lt, sl, hu, es, hr, mt, fi, fr, nl, el, and other parts

27 October 2022

26 October 2022

20 October 2022

27 July 2022

  • curprev 14:3614:36, 27 July 2022DG Regio talk contribs 45,871 bytes +28,089 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1807:18, 2 December 2021DG Regio talk contribs 12,505 bytes +1,088 Created claim: summary (P836): L’objectif principal du projet est d’accroître la production d’énergie à partir de sources renouvelables, d’améliorer la qualité de l’air et de protéger les ressources en combustibles fossiles et de réduire les émissions de CO2 dans l’atmosphère., translated_summary
  • curprev 07:1807:18, 2 December 2021DG Regio talk contribs 11,417 bytes +174 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 11,682 bytes +194 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 11,488 bytes −185 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 11,673 bytes +1,318 Created claim: summary (P836): The main objective of the project is to increase the production of energy from renewable sources, improve air quality and protect fossil fuels as well as reduce CO2 emissions into the atmosphere.As a result of the project, two installations of photovoltaic cells with a capacity of 0.99 MW each will be built.As a result of the project, a photovoltaic farm with a total capacity of 1.98 MW will produce 1782.00 MWh of electricity and achieve a CO2 e...
  • curprev 16:3316:33, 20 October 2020DG Regio talk contribs 10,355 bytes −826 Removed claim: summary (P836): The main objective of the project is to increase the production of energy from renewable sources and improve the air quality and the protection of fossil fuel resources as well as the reduction of CO2 emissions to the atmosphere. the project will result in two 0.99 MW solar PV installations with a total output of 1.98 MW. the project will produce 1 782.00 MWh of electricity and a CO2 emission reduction of 1470,15 tonnes CO2/rok will be produce...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5008:50, 10 March 2020DG Regio talk contribs 9,890 bytes +826 Created claim: summary (P836): The main objective of the project is to increase the production of energy from renewable sources and improve the air quality and the protection of fossil fuel resources as well as the reduction of CO2 emissions to the atmosphere. the project will result in two 0.99 MW solar PV installations with a total output of 1.98 MW. the project will produce 1 782.00 MWh of electricity and a CO2 emission reduction of 1470,15 tonnes CO2/rok will be produced....

24 February 2020

18 February 2020

31 January 2020

14 January 2020