Revision history of "Photovoltaic installation for REG FORM Company with limited liability limited partnership" (Q118602)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 89,086 bytes −18 Changed label, description and/or aliases in pt
  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 89,104 bytes +86 Set a claim value: summary (P836): O principal objetivo do projeto é iniciar a produção de eletricidade para consumo próprio utilizando FER pelo requerente. Em resultado da instalação, o investidor poderá produzir para a sua própria eletricidade, o que irá satisfazer parcialmente as necessidades da empresa para funcionar corretamente, garantir a segurança energética da empresa e ter um impacto positivo no ambiente através da redução das emissões de substâncias nocivas. O projeto cons...

22 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

3 March 2023

  • curprev 01:0101:01, 3 March 2023DG Regio talk contribs 85,844 bytes +36 Changed label, description and/or aliases in da, it, sk, lt, fi, hr, de, ga, sv, bg, et, lv, es, ro, el, fr, sl, hu, nl, mt, pt, and other parts

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4517:45, 2 July 2022DG Regio talk contribs 83,690 bytes +54,620 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1807:18, 2 December 2021DG Regio talk contribs 17,166 bytes +2,957 Created claim: summary (P836): L’objectif principal du projet est le démarrage par la requérante de la production d’électricité à des fins d’autoconsommation utilisant des SER. Grâce à l’installation, l’investisseur sera en mesure de produire son propre électricité, qui répondra en partie aux besoins de la Société pour le bon fonctionnement, assurera la sécurité énergétique de l’entreprise et aura un impact positif sur l’environnement en réduisant les émissions de substances...
  • curprev 07:1807:18, 2 December 2021DG Regio talk contribs 14,209 bytes +112 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 14,536 bytes +148 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 14,388 bytes −163 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 14,551 bytes +2,719 Created claim: summary (P836): The main objective of the project is to start production of electricity for own use using RES by the Applicant. As a result of installation, the Investor will be able to produce for its own electricity, which will partially satisfy the Company’s needs to function properly, ensure the company’s energy security and have a positive impact on the environment by reducing emissions of harmful substances. The project will consist of the installation of...
  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 11,832 bytes −2,148 Removed claim: summary (P836): The main objective of the project is to start the production of electricity for own use by the applicant using RES. As a result of the installation of an investment plant, the investor will be in a position to produce for its own electricity, which partly satisfies the firm’s needs for proper functioning, will ensure the energy security of the enterprise and will have a positive impact on the environment by reducing emissions of harmful substa...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5008:50, 10 March 2020DG Regio talk contribs 12,686 bytes +2,148 Created claim: summary (P836): The main objective of the project is to start the production of electricity for own use by the applicant using RES. As a result of the installation of an investment plant, the investor will be in a position to produce for its own electricity, which partly satisfies the firm’s needs for proper functioning, will ensure the energy security of the enterprise and will have a positive impact on the environment by reducing emissions of harmful substanc...

24 February 2020

18 February 2020

31 January 2020

14 January 2020