Revision history of "Development of renewable energy sources in Lubaczów and Horyniec-Zdrój communes" (Q118599)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:1916:19, 10 October 2024DG Regio talk contribs 78,056 bytes +4 Changed label, description and/or aliases in pt
  • curprev 16:1916:19, 10 October 2024DG Regio talk contribs 78,052 bytes −17 Set a claim value: summary (P836): O principal objetivo do projeto é obter 106,7 MWh de produção adicional de eletricidade e 183,35 MWh de produção adicional de calor a partir de fontes renováveis. Para atingir este objetivo, está prevista a aquisição e instalação de três instalações fotovoltaicas com uma capacidade total de 0,11 MW. A estação de tratamento de águas residuais de Załużc foi concebida com uma potência de 33,9 kW e, para a estação de tratamento de água de Wólka Krowicka...

20 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4517:45, 2 July 2022DG Regio talk contribs 72,371 bytes +46,056 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1807:18, 2 December 2021DG Regio talk contribs 15,876 bytes +2,590 Created claim: summary (P836): L’objectif principal du projet est d’obtenir 106,7 MWh de production supplémentaire d’électricité et 183,35 MWh de production supplémentaire de chaleur renouvelable. Pour atteindre cet objectif, il est prévu d’acheter et d’installer trois installations photovoltaïques d’une capacité totale de 0,11 MW. Pour la station d’épuration des eaux usées de Załużiec, une installation d’une capacité de 33,9 kW a été conçue, ainsi que pour la station de trai...
  • curprev 07:1807:18, 2 December 2021DG Regio talk contribs 13,286 bytes +169 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 13,556 bytes +140 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 13,416 bytes −150 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 13,566 bytes +2,349 Created claim: summary (P836): The main objective of the project is to obtain 106.7 MWh of additional electricity production and 183.35 MWh of additional production of heat from renewable sources. In order to meet this goal, it is planned to purchase and install three photovoltaic installations with a total capacity of 0,11 MW. The sewage treatment plant in Załużc has been designed with a power of 33.9 kW, and for the water treatment station in Wólka Krowicka and Mokrzyca two...
  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 11,217 bytes −1,877 Removed claim: summary (P836): The main objective of the project is to obtain 106.7 MWh of additional electricity production and 183.35 MWh of additional renewable heat production. To meet this objective, it is planned to purchase and assemble three photovoltaic installations with a total capacity of 0.11 MW. For the Sewage Treatment Plant, an installation with a power of 33.9 kW is designed for the plant and for the water treatment of water in the Wólka Krowicka and Mokrzy...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5008:50, 10 March 2020DG Regio talk contribs 11,811 bytes +1,877 Created claim: summary (P836): The main objective of the project is to obtain 106.7 MWh of additional electricity production and 183.35 MWh of additional renewable heat production. To meet this objective, it is planned to purchase and assemble three photovoltaic installations with a total capacity of 0.11 MW. For the Sewage Treatment Plant, an installation with a power of 33.9 kW is designed for the plant and for the water treatment of water in the Wólka Krowicka and Mokrzyca...

24 February 2020

18 February 2020

31 January 2020

14 January 2020