8 October 2024

  • curprev 18:3318:33, 8 October 2024DG Regio talk contribs 61,595 bytes +5 Changed label, description and/or aliases in pt
  • curprev 18:3318:33, 8 October 2024DG Regio talk contribs 61,590 bytes +48 Set a claim value: summary (P836): Os objectivos do projecto são os seguintes: 1. Aumentar a produção de eletricidade em 201 346 Kwh/ano em 2020 a partir da instalação de FER recém-construída em Rzeszów através da instalação de uma instalação fotovoltaica com uma capacidade de 199,04 kWp em 2019. 2. Redução das emissões de CO2 em 166,10 toneladas/ano em 2020 O projeto diz respeito à construção de uma central fotovoltaica na cobertura do edifício do requerente: Capacidade das centrais...

7 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5019:50, 2 March 2023DG Regio talk contribs 58,369 bytes +166 Changed label, description and/or aliases in lv, fr, it, da, sv, bg, sk, fi, ro, hr, de, et, cs, es, el, mt, nl, sl, hu, lt, ga, pt, and other parts

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4417:44, 2 July 2022DG Regio talk contribs 56,096 bytes +34,517 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1707:17, 2 December 2021DG Regio talk contribs 13,855 bytes +1,828 Created claim: summary (P836): Les objectifs du projet sont les suivants: 1. Augmentation de la production d’électricité de 201 346 Kwh/an en 2020 par rapport à une installation SER nouvellement construite à Rzeszów par l’installation d’une installation photovoltaïque d’une capacité de 199,04 kWc en 2019. 2. Réduction des émissions de CO2 de 166,10 tonnes/an en 2020 Le projet concerne la construction d’une centrale photovoltaïque sur le toit du bâtiment de la requérante: Puis...
  • curprev 07:1707:17, 2 December 2021DG Regio talk contribs 12,027 bytes +157 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 12,309 bytes +145 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 12,164 bytes −103 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 12,267 bytes +1,693 Created claim: summary (P836): The objectives of the project shall be: 1. Increase the production of electricity by 201 346 Kwh/year in 2020 from the newly built RES installation in Rzeszów by installing a photovoltaic installation with a capacity of 199.04 kWp in 2019. 2. Reduction of CO2 emissions by 166.10 tonnes/year in 2020 The project concerns the construction of a photovoltaic power plant on the roof of the Applicant’s building: Photovoltaic power plant capacity: 199,0...
  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 10,574 bytes −1,219 Removed claim: summary (P836): The aims of the project are to: 1. Increasing electricity production by 201 346 Kwh/year in 2020 from the newly constructed RES installation in Rzeszów by installing a 199,04 kWp photovoltaic power plant in 2019. 2. Reducing CO2 emissions by 166,10 tonnes/year in 2020 The project concerns the construction of a photovoltaic power plant on the roof of the Applicant’s building: Power of the photovoltaic power plant: 199,04 kWp Amount of electrici...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5008:50, 10 March 2020DG Regio talk contribs 10,505 bytes +1,219 Created claim: summary (P836): The aims of the project are to: 1. Increasing electricity production by 201 346 Kwh/year in 2020 from the newly constructed RES installation in Rzeszów by installing a 199,04 kWp photovoltaic power plant in 2019. 2. Reducing CO2 emissions by 166,10 tonnes/year in 2020 The project concerns the construction of a photovoltaic power plant on the roof of the Applicant’s building: Power of the photovoltaic power plant: 199,04 kWp Amount of electricity...