Revision history of "Development of RES in the municipalities of Majdan Royal and Niwiska" (Q118575)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1606:16, 9 October 2024DG Regio talk contribs 63,621 bytes +1 Changed label, description and/or aliases in pt
  • curprev 06:1606:16, 9 October 2024DG Regio talk contribs 63,620 bytes −576 Set a claim value: summary (P836): O principal objetivo do projeto é gerar 185,11 MWh de eletricidade a partir de fontes renováveis. Para cumprir este objetivo, serão planeadas as obras de construção relacionadas com a instalação de uma instalação fotovoltaica de 0,19 MW pelos municípios de Niwiska e Majdan Royal. No município de Niwiska, o projeto incluirá dois edifícios, a saber:• estação de tratamento de água em Trześnia – instalação da potência de 15,0 kW;• município no distrito...

22 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5019:50, 2 March 2023DG Regio talk contribs 61,022 bytes +8,338 Changed label, description and/or aliases in it, lv, da, ro, sk, pt, cs, de, sv, et, lt, sl, ga, bg, es, hu, hr, fr, mt, fi, el, nl, and other parts

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4417:44, 2 July 2022DG Regio talk contribs 50,567 bytes +28,279 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1707:17, 2 December 2021DG Regio talk contribs 13,882 bytes +2,052 Created claim: summary (P836): L’objectif principal du projet est d’obtenir 185,11 MWh d’électricité à partir de sources renouvelables. Pour atteindre cet objectif, des travaux de construction liés à l’installation d’une installation photovoltaïque de 0,19 MW par les municipalités de Niwiska et de Majdan Royal sont prévus.Dans la municipalité de Niwiska, le projet se composera de deux bâtiments, à savoir:• Usine de traitement des eaux usées à Trześni — une installation d’une...
  • curprev 07:1707:17, 2 December 2021DG Regio talk contribs 11,830 bytes +132 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 12,137 bytes +127 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 12,010 bytes −132 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 12,142 bytes +1,402 Created claim: summary (P836): The main objective of the project is to generate 185.11 MWh of electricity from renewable sources. In order to meet this purpose the construction works related to the installation of a photovoltaic installation of 0.19 MW by the municipalities Niwiska and Majdan Royal will be planned.In the commune Niwiska the project will include two buildings, i.e.:• Water treatment plant in Trześnia – installation of the power of 15.0 kW,• Municipality in Niw...
  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 10,740 bytes −1,230 Removed claim: summary (P836): The main objective of the project is to obtain 185.11 MWh of renewable electricity. In order to meet this objective, a construction work is planned for the installation of a 0.19 MW photovoltaic installation by the municipalities of Niwiska and Majdan. in the Niwiska municipality, the project will consist of two buildings, namely:• Water pre-treatment plant — installation of 45.0 kW,• Municipal Office in Niwisko and the Gimnazjum Public ul. Ma...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5108:51, 10 March 2020DG Regio talk contribs 10,686 bytes +1,230 Created claim: summary (P836): The main objective of the project is to obtain 185.11 MWh of renewable electricity. In order to meet this objective, a construction work is planned for the installation of a 0.19 MW photovoltaic installation by the municipalities of Niwiska and Majdan. in the Niwiska municipality, the project will consist of two buildings, namely:• Water pre-treatment plant — installation of 45.0 kW,• Municipal Office in Niwisko and the Gimnazjum Public ul. Majd...

24 February 2020

18 February 2020

31 January 2020

14 January 2020