Revision history of "Construction of photovoltaic installations for the buildings of the Water Treatment Station and Wastewater Treatment Plant in Gorzyce" (Q118574)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 51,570 bytes +9 Changed label, description and/or aliases in pt
  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 51,561 bytes −3 Set a claim value: summary (P836): O principal objetivo do projeto é gerar 185,17 MWh de eletricidade a partir de fontes renováveis. Para cumprir este objetivo, está prevista a aquisição e instalação de três instalações fotovoltaicas no município de Gorzyce: — Estação de tratamento de águas em Gorzyce — instalação com uma potência de 120 kW, — Estação de tratamento de águas em Gorzyce 1 — instalação com uma potência de 39,9 kW, — Estação de tratamento de águas em Gorzyce 2 — instalaç...

22 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5019:50, 2 March 2023DG Regio talk contribs 48,390 bytes −248 Changed label, description and/or aliases in lv, da, it, sk, hr, fi, fr, et, ro, sv, pt, ga, lt, es, hu, bg, el, cs, mt, nl, and other parts

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4417:44, 2 July 2022DG Regio talk contribs 46,515 bytes +27,691 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1607:16, 2 December 2021DG Regio talk contribs 12,696 bytes +1,369 Created claim: summary (P836): L’objectif principal du projet est d’obtenir 185,17 MWh d’électricité à partir de sources renouvelables. Pour atteindre cet objectif, il est prévu d’acheter et d’installer trois installations photovoltaïques dans la commune de Gorzyce: — Station d’épuration des eaux usées à Gorzyce — installation d’une capacité de 120 kW, — Station de traitement de l’eau à Gorzyce 1 — installation d’une capacité de 39,9 kW, — Station de traitement de l’eau à Gor...
  • curprev 07:1607:16, 2 December 2021DG Regio talk contribs 11,327 bytes +225 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 11,541 bytes +193 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 11,348 bytes −180 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 11,528 bytes +1,297 Created claim: summary (P836): The main objective of the project is to generate 185.17 MWh of electricity from renewable sources. In order to meet this goal, it is planned to purchase and install three photovoltaic installations in the municipality of Gorzyce: — Water treatment plant in Gorzyce – installation with a capacity of 120 kW, – Water treatment station in Gorzyce 1 – installation with a power of 39.9 kW, – Water treatment station in Gorzyce 2 – installation with a po...
  • curprev 16:3216:32, 20 October 2020DG Regio talk contribs 10,231 bytes −813 Removed claim: summary (P836): The main objective of the project is to obtain 185.17 MWh of renewable electricity. In order to meet this objective, it is planned to purchase and assemble three photovoltaic installations in the municipality of Gorzyce: — Gorzyce wastewater treatment plant — installation of 120 kW, — Water treatment plant in Gorzyce 1 — installation with a power of 39.9 kW, — Water treatment plant in Gorzyce 2 — installation of 39.9 kW., remove_old_english_tr...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5108:51, 10 March 2020DG Regio talk contribs 9,753 bytes +813 Created claim: summary (P836): The main objective of the project is to obtain 185.17 MWh of renewable electricity. In order to meet this objective, it is planned to purchase and assemble three photovoltaic installations in the municipality of Gorzyce: — Gorzyce wastewater treatment plant — installation of 120 kW, — Water treatment plant in Gorzyce 1 — installation with a power of 39.9 kW, — Water treatment plant in Gorzyce 2 — installation of 39.9 kW., Adding English summary

24 February 2020

18 February 2020

31 January 2020

14 January 2020