Revision history of "Photovoltaic installation at EBA Sp. z o.o. in Krosno" (Q118562)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

20 October 2022

27 July 2022

  • curprev 14:3514:35, 27 July 2022DG Regio talk contribs 61,509 bytes +38,531 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1707:17, 2 December 2021DG Regio talk contribs 14,484 bytes +2,041 Created claim: summary (P836): L’objectif principal du projet est d’accroître la production d’énergie renouvelable (production distribuée) sur place tout en réduisant les émissions. Le projet comprend la fourniture, l’installation et la mise en service d’une installation photovoltaïque d’une capacité de 197,12 kWc (0,19 MW arrondie), qui sera montée au sol — parcelle 579/34 et 579/40, détenue par EBA. Ce système d’installation produira de l’électricité pour répondre aux besoi...
  • curprev 07:1707:17, 2 December 2021DG Regio talk contribs 12,443 bytes +117 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:3116:31, 20 October 2020DG Regio talk contribs 12,765 bytes +112 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3116:31, 20 October 2020DG Regio talk contribs 12,653 bytes −105 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3116:31, 20 October 2020DG Regio talk contribs 12,758 bytes +1,911 Created claim: summary (P836): The key objective of the project is to increase the production of energy from renewable sources (dispersed generation) on the site of the project, while reducing emissions. The project includes the delivery, installation and commissioning of a photovoltaic installation with a power of 197,12 kWp (0.19 MW rounded), which will be mounted on the ground – plot 579/34 and 579/40, owned by EBA. This system will generate electricity for EBA’s own needs...
  • curprev 16:3116:31, 20 October 2020DG Regio talk contribs 10,847 bytes −1,516 Removed claim: summary (P836): The key objective of the project is to increase the production of energy from renewable sources (in distributed generation) at the site of the project while reducing emissions. The project covers the delivery, installation and launch of a 197,12kWp (0.19 MW after rounding) installation to be mounted on the land on land 579/34 and 579/40 of the EBA company. This system of installation will produce the electricity for the own business of the Aut...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5108:51, 10 March 2020DG Regio talk contribs 11,073 bytes +1,516 Created claim: summary (P836): The key objective of the project is to increase the production of energy from renewable sources (in distributed generation) at the site of the project while reducing emissions. The project covers the delivery, installation and launch of a 197,12kWp (0.19 MW after rounding) installation to be mounted on the land on land 579/34 and 579/40 of the EBA company. This system of installation will produce the electricity for the own business of the Autho...

24 February 2020

18 February 2020

31 January 2020

14 January 2020