Revision history of "Construction of a photovoltaic farm with accompanying infrastructure in Wietlin" (Q118547)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:4115:41, 7 October 2024DG Regio talk contribs 68,888 bytes +1 Changed label, description and/or aliases in pt
  • curprev 15:4115:41, 7 October 2024DG Regio talk contribs 68,887 bytes −162 Set a claim value: summary (P836): O objetivo do projeto é aumentar a quantidade de energia produzida a partir de fontes renováveis e, consequentemente, melhorar a qualidade e a proteção do ambiente, reduzir as emissões de gases com efeito de estufa para a atmosfera. O projeto diz respeito à construção de uma exploração fotovoltaica com as infraestruturas necessárias em Wietlin. Parâmetros fundamentais da instalação fotovoltaica: 1. Potência-199,68 kW 2.A quantidade de energia produz...

23 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4317:43, 2 July 2022DG Regio talk contribs 60,763 bytes +36,925 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:0807:08, 2 December 2021DG Regio talk contribs 14,854 bytes +2,214 Created claim: summary (P836): L’objectif du projet est d’augmenter la quantité d’énergie produite à partir de sources renouvelables, améliorant ainsi la qualité et la protection de l’environnement et réduisant les émissions de gaz à effet de serre dans l’atmosphère. Le projet concerne la construction d’une ferme photovoltaïque dotée des infrastructures nécessaires à Wietlin. Paramètres de base de l’installation photovoltaïque: 1. Puissance-199,68 kW 2.Quantité d’énergie prod...
  • curprev 07:0807:08, 2 December 2021DG Regio talk contribs 12,640 bytes +142 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:2216:22, 20 October 2020DG Regio talk contribs 12,937 bytes +138 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2216:22, 20 October 2020DG Regio talk contribs 12,799 bytes −151 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2216:22, 20 October 2020DG Regio talk contribs 12,950 bytes +1,826 Created claim: summary (P836): The aim of the project is to increase the amount of energy generated from renewable sources and, as a result, improve the quality and protection of the environment, reduce greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic farm with the necessary infrastructure in Wietlin. Basic parameters of the photovoltaic installation: 1. Power-199,68 kW 2.The amount of energy produced – 179,71 MWhe/year. 3....
  • curprev 16:2216:22, 20 October 2020DG Regio talk contribs 11,124 bytes −1,520 Removed claim: summary (P836): The project aims at increasing the amount of energy from renewable sources and, as a result, improving the quality and protection of the environment, reducing greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic farm with the necessary infrastructure in the village of Wietlin. Basic parameters of the photovoltaic installation: 1. Moc-199.68 kW 2.Quantity of energy produced — 179,71 MWhe/year. 3....

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5108:51, 10 March 2020DG Regio talk contribs 11,368 bytes +1,520 Created claim: summary (P836): The project aims at increasing the amount of energy from renewable sources and, as a result, improving the quality and protection of the environment, reducing greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic farm with the necessary infrastructure in the village of Wietlin. Basic parameters of the photovoltaic installation: 1. Moc-199.68 kW 2.Quantity of energy produced — 179,71 MWhe/year. 3. T...

24 February 2020

18 February 2020

31 January 2020

14 January 2020