Revision history of "Construction of a photovoltaic farm in Glinik Dolny IX" (Q118545)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

20 October 2022

27 July 2022

  • curprev 14:3514:35, 27 July 2022DG Regio talk contribs 60,227 bytes +36,512 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:0807:08, 2 December 2021DG Regio talk contribs 14,797 bytes +2,220 Created claim: summary (P836): L’objectif du projet est d’augmenter la quantité d’énergie produite à partir de sources renouvelables, améliorant ainsi la qualité et la protection de l’environnement et réduisant les émissions de gaz à effet de serre dans l’atmosphère. Le projet concerne la construction d’une ferme photovoltaïque dotée des infrastructures nécessaires à Glinik Dolny. Paramètres de base de l’installation photovoltaïque: 1. Puissance-199,68 kW 2. Quantité d’énergi...
  • curprev 07:0807:08, 2 December 2021DG Regio talk contribs 12,577 bytes +120 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:2216:22, 20 October 2020DG Regio talk contribs 12,896 bytes +113 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2216:22, 20 October 2020DG Regio talk contribs 12,783 bytes −112 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2216:22, 20 October 2020DG Regio talk contribs 12,895 bytes +1,828 Created claim: summary (P836): The aim of the project is to increase the amount of energy generated from renewable sources and, as a result, improve the quality and protection of the environment, reduce greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic farm with the necessary infrastructure in Glinik Dolny. Basic parameters of the photovoltaic installation: 1. Power-199.68 kW 2. Amount of energy produced – 179,71 MWhe/year....
  • curprev 16:2216:22, 20 October 2020DG Regio talk contribs 11,067 bytes −1,527 Removed claim: summary (P836): The project aims at increasing the amount of energy from renewable sources and, as a result, improving the quality and protection of the environment, reducing greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic farm with the necessary infrastructure in the village of Glinik Dony. Basic parameters of the photovoltaic installation: 1. Moc-199.68 kW 2. The amount of energy produced — 179,71 MWhe/y...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5108:51, 10 March 2020DG Regio talk contribs 11,310 bytes +1,527 Created claim: summary (P836): The project aims at increasing the amount of energy from renewable sources and, as a result, improving the quality and protection of the environment, reducing greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic farm with the necessary infrastructure in the village of Glinik Dony. Basic parameters of the photovoltaic installation: 1. Moc-199.68 kW 2. The amount of energy produced — 179,71 MWhe/yea...

24 February 2020

18 February 2020

31 January 2020

14 January 2020