Revision history of "Construction of a photovoltaic farm with accompanying infrastructure in Iskrzynia" (Q118521)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:1916:19, 10 October 2024DG Regio talk contribs 68,826 bytes 0 Changed label, description and/or aliases in pt
  • curprev 16:1916:19, 10 October 2024DG Regio talk contribs 68,826 bytes −156 Set a claim value: summary (P836): O objetivo do projeto é aumentar a quantidade de energia produzida a partir de fontes renováveis e, consequentemente, melhorar a qualidade e a proteção do ambiente, reduzir as emissões de gases com efeito de estufa para a atmosfera. O projeto diz respeito à construção de uma exploração fotovoltaica com as infraestruturas necessárias em Iskrzynia. Parâmetros fundamentais da instalação fotovoltaica: 1. Potência-199.68 kW 2. Quantidade de energia produ...

23 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

20 October 2022

27 July 2022

  • curprev 14:3514:35, 27 July 2022DG Regio talk contribs 60,804 bytes +36,905 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 14,865 bytes +2,226 Created claim: summary (P836): L’objectif du projet est d’augmenter la quantité d’énergie produite à partir de sources renouvelables, améliorant ainsi la qualité et la protection de l’environnement et réduisant les émissions de gaz à effet de serre dans l’atmosphère. Le projet concerne la construction d’une ferme photovoltaïque avec les infrastructures nécessaires dans le village d’Ikrania. Paramètres de base de l’installation photovoltaïque: 1. Puissance-199,68 kW 2. Quantit...
  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 12,639 bytes +151 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:2116:21, 20 October 2020DG Regio talk contribs 12,927 bytes +140 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2116:21, 20 October 2020DG Regio talk contribs 12,787 bytes −147 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2116:21, 20 October 2020DG Regio talk contribs 12,934 bytes +1,820 Created claim: summary (P836): The aim of the project is to increase the amount of energy generated from renewable sources and, as a result, improve the quality and protection of the environment, reduce greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic farm with the necessary infrastructure in Iskrzynia. Basic parameters of the photovoltaic installation: 1. Power-199.68 kW 2. Amount of energy produced -179,712kWhe/year 3. Es...
  • curprev 16:2116:21, 20 October 2020DG Regio talk contribs 11,114 bytes −1,522 Removed claim: summary (P836): The project aims at increasing the amount of energy from renewable sources and, as a result, improving the quality and protection of the environment, reducing greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic farm together with the necessary infrastructure in the town of Ibin. Basic parameters of the photovoltaic installation: 1. Moc-199.68 kW 2. The amount of energy produced -179,712kWhe/yea...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5108:51, 10 March 2020DG Regio talk contribs 11,353 bytes +1,522 Created claim: summary (P836): The project aims at increasing the amount of energy from renewable sources and, as a result, improving the quality and protection of the environment, reducing greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic farm together with the necessary infrastructure in the town of Ibin. Basic parameters of the photovoltaic installation: 1. Moc-199.68 kW 2. The amount of energy produced -179,712kWhe/year...

24 February 2020

18 February 2020

31 January 2020

14 January 2020