Revision history of "Construction of a 1.63 MW photovoltaic farm with the necessary infrastructure in Łazy Gm. Rymanów" (Q118516)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:3318:33, 8 October 2024DG Regio talk contribs 71,152 bytes +12 Changed label, description and/or aliases in pt
  • curprev 18:3318:33, 8 October 2024DG Regio talk contribs 71,140 bytes +26 Set a claim value: summary (P836): O principal objetivo do projeto é obter 1581,1 MWh de produção adicional de eletricidade a partir de fontes renováveis. Para atingir este objetivo, a empresa Thewind Sp. z o. o. está a planear a realização de uma exploração fotovoltaica em três locais com uma capacidade de 1,63 MW. A execução do projeto contribuirá para cumprir os requisitos do Pacote Clima – a produção de eletricidade a partir de fontes renováveis aumentará. O investimento não só r...

22 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5019:50, 2 March 2023DG Regio talk contribs 67,940 bytes −140 Changed label, description and/or aliases in it, da, lv, sk, et, fi, ga, fr, ro, sv, bg, de, hu, cs, sl, mt, es, pt, lt, nl, hr, el, and other parts

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4317:43, 2 July 2022DG Regio talk contribs 65,960 bytes +41,715 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 15,130 bytes +2,229 Created claim: summary (P836): L’objectif principal du projet est d’obtenir 1 581,1 MWh de production supplémentaire d’électricité à partir de sources renouvelables. Pour atteindre cet objectif, il est prévu de construire une ferme photovoltaïque dans trois emplacements de 1,63 MW par TheWind Sp. z o.o.. La mise en œuvre du projet contribuera à satisfaire aux exigences du paquet Climat — la production d’électricité à partir de sources renouvelables augmentera. L’investissemen...
  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 12,901 bytes +171 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:2116:21, 20 October 2020DG Regio talk contribs 13,169 bytes +158 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2116:21, 20 October 2020DG Regio talk contribs 13,011 bytes −155 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2116:21, 20 October 2020DG Regio talk contribs 13,166 bytes +2,056 Created claim: summary (P836): The main objective of the project is to obtain 1581.1 MWh of additional production of electricity from renewable sources. In order to meet this goal, the company Thewind Sp. z o. o. is planning to carry out a photovoltaic farm in three locations with a capacity of 1,63 MW. The implementation of the project will contribute to meeting the requirements of the Climate Package – the production of electricity from renewable sources will increase. The...
  • curprev 16:2116:21, 20 October 2020DG Regio talk contribs 11,110 bytes −1,495 Removed claim: summary (P836): The main objective of the project is to obtain 1 581.1 MWh of additional renewable electricity production. In order to meet this objective, a 1.63 MW of TheWind Sp. z o. o. The project will contribute to meeting the requirements of the climate package — the production of electricity from renewable sources will increase. The investment will result not only in the financial benefits for TheWind, but will also have an impact on raising awareness...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5108:51, 10 March 2020DG Regio talk contribs 11,319 bytes +1,495 Created claim: summary (P836): The main objective of the project is to obtain 1 581.1 MWh of additional renewable electricity production. In order to meet this objective, a 1.63 MW of TheWind Sp. z o. o. The project will contribute to meeting the requirements of the climate package — the production of electricity from renewable sources will increase. The investment will result not only in the financial benefits for TheWind, but will also have an impact on raising awareness ab...

24 February 2020

18 February 2020

31 January 2020

14 January 2020