Revision history of "Construction of a small photovoltaic installation at the school and pool complex in Cmolas – stage I and installation of photovoltaic equipment on a sewage treatment plant in Cmolas" (Q118509)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3515:35, 7 October 2024DG Regio talk contribs 100,764 bytes −17 Changed label, description and/or aliases in pt
  • curprev 15:3515:35, 7 October 2024DG Regio talk contribs 100,781 bytes −29 Set a claim value: summary (P836): Projeto para a execução de tarefas: É o rabo. 1: Desenvolvimento do estudo de viabilidade do projecto Zad. 2: Trabalhos de construção e montagem: Construção de uma pequena instalação fotovolt nas instalações escolares de Cmolas – fase I e instalação de equipamento fotovolt na estação de tratamento de águas residuais de Cmolas; É o rabo. 3: Supervisão dos investidores; É o rabo. 4: Promoção do projecto. Objectivo principal do projecto: O «desenvolvim...

22 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5019:50, 2 March 2023DG Regio talk contribs 97,637 bytes +488 Changed label, description and/or aliases in fr, ro, lv, da, it, et, lt, sk, de, sv, cs, bg, es, hr, fi, hu, sl, pt, ga, nl, el, mt, and other parts

27 October 2022

26 October 2022

20 October 2022

27 July 2022

  • curprev 14:3514:35, 27 July 2022DG Regio talk contribs 95,032 bytes +62,338 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 18,324 bytes +3,495 Created claim: summary (P836): Projet d’exécution des tâches: AWW. 1: Développement d’une étude de faisabilité du projet Zad. 2: Travaux de construction et d’assemblage: Construction d’une petite installation photovoltaïque pour un ensemble d’installations de piscine à Cmolas — phase I et installation d’équipements photovoltaïques à la station d’épuration de Cmolas; AWW. 3: La surveillance des investisseurs; AWW. 4: Promotion du projet. Objectif principal du projet: «Le dével...
  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 14,829 bytes +274 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:2116:21, 20 October 2020DG Regio talk contribs 14,994 bytes +243 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2116:21, 20 October 2020DG Regio talk contribs 14,751 bytes −258 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2116:21, 20 October 2020DG Regio talk contribs 15,009 bytes +2,973 Created claim: summary (P836): Project for the implementation of tasks: It’s the ass. 1: Development of feasibility study of the project Zad. 2: Construction and assembly works: Construction of a small photovolt installation at the school facilities in Cmolas – stage I and installation of photovolt equipment on the sewage treatment plant in Cmolas; It’s the ass. 3: Investor supervision; It’s the ass. 4: Promotion of the project. Main objective of the project: “Development of...
  • curprev 16:2116:21, 20 October 2020DG Regio talk contribs 12,036 bytes −2,342 Removed claim: summary (P836): Project on the implementation of the tasks: Task 1: Development of a feasibility study of the Zad project. 2: Construction and assembly works: Construction of a small on-site installation for the installation of a small installation plant at the Cmolassa — stage I and installation of the photo volume equipment on the sewage treatment plant in the Cmolassa; Task 3: Investor supervision; Task 4: Project promotion. Main objective of the project:...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5108:51, 10 March 2020DG Regio talk contribs 13,088 bytes +2,342 Created claim: summary (P836): Project on the implementation of the tasks: Task 1: Development of a feasibility study of the Zad project. 2: Construction and assembly works: Construction of a small on-site installation for the installation of a small installation plant at the Cmolassa — stage I and installation of the photo volume equipment on the sewage treatment plant in the Cmolassa; Task 3: Investor supervision; Task 4: Project promotion. Main objective of the project: “T...

24 February 2020

18 February 2020

31 January 2020

14 January 2020