Revision history of "Construction of a photovoltaic farm in Brzóza Stadnicka" (Q118506)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 75,566 bytes +6 Changed label, description and/or aliases in pt
  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 75,560 bytes −137 Set a claim value: summary (P836): O principal objetivo do projeto é aumentar a produção de energia a partir de fontes renováveis – energia solar no voivodato de Podkarpackie através da construção de centrais fotovoltaicas de 1,17 MW, convertendo a radiação solar por conversão direta em corrente elétrica (realização direta do objetivo específico da ação 3.1 RPOWP). Aumento da produção de energia a partir de fontes de energia renováveis na produção distribuída. 2. Redução das emissões...

20 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4317:43, 2 July 2022DG Regio talk contribs 68,238 bytes +42,691 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 15,646 bytes +2,533 Created claim: summary (P836): L’objectif principal du projet est d’accroître la production d’énergie à partir de sources renouvelables — l’énergie solaire dans la voïvodie de Podkarpackie par la construction d’une centrale photovoltaïque de 1,17 MW, la conversion de l’énergie solaire par la conversion directe en électricité (mise en œuvre directe de l’objectif spécifique de la mesure 3.1 RPOWP). Augmentation de la production d’énergie à partir de sources d’énergie renouvelab...
  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 13,113 bytes +122 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:2116:21, 20 October 2020DG Regio talk contribs 13,430 bytes +115 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2116:21, 20 October 2020DG Regio talk contribs 13,315 bytes −115 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2116:21, 20 October 2020DG Regio talk contribs 13,430 bytes +2,152 Created claim: summary (P836): The main objective of the project is to increase the production of energy from renewable sources – solar energy in Podkarpackie voivodship through the construction of 1.17 MW photovoltaic power plants, converting solar radiation by direct conversion to electric current (direct realisation of the specific objective of action 3.1 RPOWP). Increased production of energy from renewable energy sources in distributed generation. 2. Reduced emissions of...
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 11,278 bytes −1,761 Removed claim: summary (P836): The main objective of the project is to increase the production of energy from renewable sources — the solar energy in Podkarpackie Province by the construction of a 1.17 MW photovoltaic power plant which converts solar radiation by direct conversion to electricity (direct implementation of the specific objective of POWP 3.1). the specific objectives will be 1. Increased production of energy from distributed renewable energy sources. 2. Reduce...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5108:51, 10 March 2020DG Regio talk contribs 11,753 bytes +1,761 Created claim: summary (P836): The main objective of the project is to increase the production of energy from renewable sources — the solar energy in Podkarpackie Province by the construction of a 1.17 MW photovoltaic power plant which converts solar radiation by direct conversion to electricity (direct implementation of the specific objective of POWP 3.1). the specific objectives will be 1. Increased production of energy from distributed renewable energy sources. 2. Reduced...

24 February 2020

18 February 2020

31 January 2020

14 January 2020