Revision history of "Installation of photovoltaic panels on roofs of production halls with a capacity of 199.80 kW" (Q118504)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3515:35, 7 October 2024DG Regio talk contribs 68,895 bytes −1 Changed label, description and/or aliases in pt
  • curprev 15:3515:35, 7 October 2024DG Regio talk contribs 68,896 bytes −30 Set a claim value: summary (P836): O objetivo do projeto é utilizar a radiação solar para produzir eletricidade para a unidade de produção em Rożniatowo, no município de Zarzecze. Para este fim, a instalação de painéis fotovoltaicos com uma capacidade elétrica total de 199,80 kW será instalada nos telhados das salas de produção existentes. A instalação será composta por 740 painéis com uma capacidade de 270 W. Os painéis serão montados no telhado usando elementos estruturais pré-fabr...

7 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5019:50, 2 March 2023DG Regio talk contribs 65,752 bytes +5 Changed label, description and/or aliases in lv, it, fr, sv, da, bg, sk, fi, ro, de, et, cs, hr, es, el, mt, nl, sl, hu, lt, ga, pt, and other parts

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4317:43, 2 July 2022DG Regio talk contribs 63,631 bytes +39,858 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 14,899 bytes +2,155 Created claim: summary (P836): L’objectif du projet est d’utiliser l’énergie solaire pour produire de l’électricité pour l’usine de production de Rozhnatów, dans la municipalité de Zarzecze. À cette fin, l’installation de panneaux photovoltaïques d’une puissance électrique totale de 199,80 kW sera installée sur les toits des halls de production existants. L’installation se composera de 740 panneaux d’une puissance de 270 W. Les panneaux seront montés sur le toit en utilisant...
  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 12,744 bytes +171 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 13,012 bytes +152 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 12,860 bytes −111 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 12,971 bytes +1,991 Created claim: summary (P836): The aim of the project is to use solar radiation to produce electricity for the production plant in Rożniatowo in Zarzecze Municipality. For this purpose, the installation of photovoltaic panels with a total electrical capacity of 199,80 kW will be installed on the roofs of existing production halls. The installation will consist of 740 panels with a capacity of 270 W. The panels will be mounted to the roof using special prefabricated structural...
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 10,980 bytes −1,562 Removed claim: summary (P836): The project aims at using solar radiation to produce electricity for the production plant in Rożniatów in the municipality of Zarzeze. To this end, the installation of solar panels with an installed electricity capacity of 199.80 kW will be installed on the roof of the existing production halls. The installation will consist of 740 panels of panels with a capacity of 270 W. Panele shall be installed in the roof by special prefabricated structu...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5108:51, 10 March 2020DG Regio talk contribs 11,269 bytes +1,562 Created claim: summary (P836): The project aims at using solar radiation to produce electricity for the production plant in Rożniatów in the municipality of Zarzeze. To this end, the installation of solar panels with an installed electricity capacity of 199.80 kW will be installed on the roof of the existing production halls. The installation will consist of 740 panels of panels with a capacity of 270 W. Panele shall be installed in the roof by special prefabricated structura...

24 February 2020

18 February 2020

31 January 2020

14 January 2020