Revision history of "Development of renewable energy sources in municipalities: Rams Sandomierski, Gorzyce, Horyniec-Zdrój, Lubaczów, Lubaczów, Narol, Nowa Dęba" (Q118503)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 71,137 bytes −15 Changed label, description and/or aliases in pt
  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 71,152 bytes −13 Set a claim value: summary (P836): O principal objetivo do projeto é atingir uma capacidade adicional de 4,28 MW para produzir eletricidade e calor a partir de fontes renováveis. Para cumprir este objetivo, está prevista a aquisição de instalações fotovoltaicas, bombas de calor de ar com recipientes de água quente e caldeiras de biomassa. As instalações de FER instaladas reduzirão o consumo de fontes de energia não renováveis. As emissões de substâncias nocivas diminuirão, resultando...

20 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5019:50, 2 March 2023DG Regio talk contribs 67,991 bytes −44 Changed label, description and/or aliases in lv, it, da, sk, el, pt, fr, ro, fi, et, sv, hr, ga, sl, lt, de, hu, bg, nl, es, mt, cs, and other parts

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4317:43, 2 July 2022DG Regio talk contribs 64,700 bytes +40,860 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 14,964 bytes +2,166 Created claim: summary (P836): L’objectif principal du projet est d’atteindre 4,28 MW de capacité supplémentaire pour produire de l’électricité et de la chaleur à partir de sources renouvelables. Pour atteindre cet objectif, il est prévu d’acheter des installations photovoltaïques, des pompes à chaleur à air avec des réservoirs de stockage d’eau chaude et des chaudières à biomasse. Les installations SER installées permettront de réduire la consommation de sources d’énergie no...
  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 12,798 bytes +223 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 13,014 bytes +203 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 12,811 bytes −215 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 13,026 bytes +1,944 Created claim: summary (P836): The main objective of the project is to achieve 4.28 MW additional capacity to generate electricity and heat from renewable sources. In order to meet this goal, it is planned to purchase photovoltaic installations, air heat pumps with hot water containers and biomass boilers. Installed RES installations will reduce the consumption of non-renewable energy sources. Emissions of harmful substances will decrease, resulting in improved air quality in...
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 11,082 bytes −1,480 Removed claim: summary (P836): The project has as its primary objective the acquisition of 4.28 MW of additional capacity to generate electricity and heat from renewable sources. In order to meet this objective, the purchase of PV installations, air heat pumps with hot water storage tanks and biomass boilers is planned. The installation of RES installations will reduce the use of non-renewable sources of energy. Emissions of harmful substances will decrease, resulting in im...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5108:51, 10 March 2020DG Regio talk contribs 11,272 bytes +1,480 Created claim: summary (P836): The project has as its primary objective the acquisition of 4.28 MW of additional capacity to generate electricity and heat from renewable sources. In order to meet this objective, the purchase of PV installations, air heat pumps with hot water storage tanks and biomass boilers is planned. The installation of RES installations will reduce the use of non-renewable sources of energy. Emissions of harmful substances will decrease, resulting in impr...

24 February 2020

18 February 2020

31 January 2020

14 January 2020